Projects for 2010 year – boiler plants, heat and gas supply networks, water supply

Brief projects outline
In the course of its activity the Institute has gained extensive design work experience in construction of engineering infrastructure networks and power facilities at a wide range of locations.
Design documentation developed by the specialists of the Engineering Infrastructure Design Institute became the basis for construction and reconstruction of many facilities in the Russian Federation among which motorways, mainline and distribution gas and oil pipelines in the Central, North-West, Southern, Volga regions; heating networks, communications and telephony, power networks as well as water supply and sewerage networks of Moscow, Saint-Petersburg and Leningrad's area.
Our company designing the systems of electrochemical protection of underground utilities has provided protection of many tens of kilometers of underground utilities.
On the basis of drawn-up and approved by industrial safety expert review documentation on liquidation and preservation of hazardous production facilities hundreds of technical devices were decommissioned and excluded from the register.

Company projects — 2010

projects
2008

projects
2009

projects
2011

projects
2012

projects
2013

projects
2014

projects
2015

  1. Development of working documents for the heating system, ventilation, water supply, sewage, and power supply system at the facility: "Construction of Western High-Speed Diameter Motorway. Construction site area from Kalinina Street to interchange near Ekateringofka River. Reconstruction of the premises for Heat Supply and Sewage System service (UTVK). Location: St. Petersburg, Volniy Ostrov, 4 Zh, Utility Building 3, Room 6-N"
  2. Development of design project for relocation of anode grounding circuit for high pressure pipeline electrochemical protection installation of the facility: St. Petersburg, Vyborgsky District, Pargolovo Settlement, Prigorodny, Lot 79
  3. Works on development of design project for modernization of 3 installations for gas pipeline electrochemical corrosion protection at the facility. Location: St. Petersburg, Pushkinsky District, western part of "Vostochnaya" (Pushkinskaya) industrial area
  4. Development of design project for reconstruction of external lighting networks (temporary) within the area of alteration works for the building. Location: St. Petersburg, Zagorodny Prospect, 19 А.
  5. Development of design project documentation; instituting the execution of industry safety expertise of design project documentation of the facility – soluble coffee production plant. Location: Leningrad Region, Lomonosov District, Gorelovo Production Zone, Quarter 12, Volkhonskoye Shosse, 7/1 (Kraft Foods).
  6. Works on development of design project for modernization of gas pipeline electrochemical corrosion protection installation at the facility. Facility location: St. Petersburg, Shushary Settlement, Kolpinskoye Shosse, Lot 29.
  7. Development of design project of heat supply and ventilation systems of the administrative building. Location: St. Petersburg, Fontanka River Emb, Section 1 (south-west of House 9 A along Klimov Lane)
  8. Development of design project documentation for heat supply network including «Corrosion Protection» chapter for Facility 8/VPG. Location: St. Petersburg, Ordzhonikidze St, Section 1 (northwest of crossing with Kosmonavtov Prospect).
  9. Development of design project «Individual Heat Supply Stations and Commercial Heat Supply Metering Stations for Residential Building with Built-in and Annex Rooms and a Parking Lot (7 ITP)» for Facility 8/VPG. Location: St. Petersburg, Ordzhonikidze St, Section 1 (northwest of crossing with Kosmonavtov Prospect).
  10. Works to implement the project documentation elimination of hazardous production facilities - equipment gas boiler and chimney at: Saint-Petersburg, ul. Chernigov, 5. (Federal State of Higher Professional Education "Saint-Petersburg State Academy of Veterinary Medicine).
  11. Works on development of design project for modernization of gas pipeline electrochemical corrosion protection installation at the facility. Location: St. Petersburg, Borovaya St, 19 A.
  12. Development of design project for relocation of pipeline electrochemical protection installation and anode grounding circuit from under the facility construction site. Location: St. Petersburg, Polikarpov Alley, 7.
  13. Works on development of design project for modernization of electrochemical corrosion protection of high pressure gas pipeline and steel case at the facility. Location: St. Petersburg, Kalininsky District, Murino, 11.
  14. Development of design project for individual heat supply station with commercial heat power metering unit at the facility. Location: St. Petersburg, Fontanka River Emb, Section 1 (south-west of House 9 A along Klimov Lane).
  15. Development of design project documentation for liquidation of hazardous production facility — fuel oil storage (Location: St. Petersburg, Aptekarsky Lane, 5 A) and instituting the execution of industry safety expertise of design project documentation.
  16. Works on development of design project documentation («Design Project» stage) and working documentation («Working Documentation» stage): — external gas supply for 5 residential houses (including selection and connection to rack-type gas distributing station)
    — internal gas supply for 5 residential houses and gas roof-top boiler plants
    — facility with 5 roof-top boiler plants for residential houses, location: «Krasnodar Territory, Kropotkin, Section 7, Olympiyskaya St, 7; Section 16, Svobodnaya St, 16»
  17. Reconstruction of external lighting networks within the area of housebreaking and new house construction. Location: St. Petersburg, Bumazhnaya St, 8 and Perekopskaya St, 9.
  18. Correction of working design project of the heating network and arrangement of its approval in compliance with the design assignment of facility 3/7-34. Location: St. Petersburg, Rzhevka-Porokhovye, Quarter 3, west of House 6, Building 3 A, along Lenskaya Street.
  19. Modernization of heat supply station for transfer to dual-cycle heating system and hot water supply system for fire department of North-West Heat Power Plant branch of JSC INTER RAO UES.
  20. Works on development (connection) of working documentation for module electric boiler plant and connecting heat supply networks to the building of dispatch center of facility delivery and acceptance point (DAP): «Construction of Western High-Speed Diameter Motorway. Delivery and Acceptance Point Dispatch Center Building»
  21. Works on development of design project documentation for individual heat supply station with heat power metering unit of dispatch center of facility DAP: «Construction of Western High-Speed Diameter Motorway. DAP Dispatch Center Building».
  22. Reconstruction of external lighting networks within the area of housebreaking and new house construction. Location: St. Petersburg, 10th Sovetskaya St, 8 A.
  23. Development of design project documentation on architectural and interior solutions (interior design), process and engineering systems in office and production premises, including: power supply, lighting, ventilation, heating, water supply, sewage (further on – Design works, Design project documentation) as part of modernization of premises. Location: St. Petersburg, Vozrozhdeniya St, 20 a, Letter A, premises overall area 1,401.5 sq m.
  24. Development of design project documentation «Arrangement of Driveway and Interchange to M-18 Highway (Kola Motorway) and Access to Baltkond-Neva, LLC Cargo Terminal»
  25. Works on installation of heat-transfer equipment at the facility. Location: St. Petersburg, Krasnoye Selo, Yunikh Pionerov St, 18, Building 5
  26. Works on development of design project for gas pipeline electrochemical corrosion protection installation at the facility. Location: St. Petersburg, Arsenalnaya St, Section 1 (south-west of crossing with Mineralnaya Street).
  27. Development of design project documentation for gas pipeline electrochemical corrosion protection at the facility: Leningrad Region, Lomonosovsky District, from Telezi Village to Aropakuzi Village) "Gas Pipelines from Gas Distribution Station "Lagolovo" to South-Western Heat Power Plant in 2007-2009 (Phase II). Stage 3. From Gas Distribution Station "Lagolovo" (existing) to Gas Distribution Station "Lagolovo" (new construction)".
  28. Works on development of design projects for relocation of engineering networks (external gas supply networks, power supply, water supply and sewage networks, telephone communication and external lighting systems) beyond facility construction site: «Phase 3 of Multifunctional Complex. Location: St. Petersburg, Krasnogvardeysky District, Zanevskaya Square, Section 1, (west of House 71 Building 1 А, along Zanevsky Prospekt)".
  29. Installation of mechanical equipment of cold water supply pressure holding pump union at the facility. Location: St. Petersburg, Krasnoye Selo, Yunykh Pionerov St, 18, Building 5.
  30. Set up of hanger-support system of the main steam pipeline, supply pipeline and steam lines within boiler No.4 of the Central Heat Power Plant of JSC TGK-1 Nevsky branch.
  31. Development of design project documentation for preservation of two chimney stacks of OMZ SPECIAL STEELS, LLC facility.
  32. Development of design project of heat supply networks of the facility. Location: St. Petersburg, Fontanka River Emb, Section 1 (south-west of House 9 A along Klimov Lane).
  33. Development of chapters «External water supply and sewage networks» for the facility. Location: St. Petersburg, Primorsky District, Beloostrovskaya St, 6 A.
  34. Development of chapters «External water supply and sewage networks» for the facility. Location: Administrative building with built-in parking: St. Petersburg, Ligovsky Prospect, 13-15 A.
  35. Development of chapters: «Bill of Quantities», «Construction Management Project» and «Temporary Networks» of design projects for reconstruction of district heat supply networks:
    • quarter 13 North of Novoselov St. (СУН) from TK-92, from House 50 Bldg. 3 along Podvoyskogo Street to central heat distribution station for Houses 50 Bldg. 2, 48 Bldg. 2, 50 Bldg.1, 46 Bldg.1 along Podvoyskogo Street.
    • quarter 13 North of Novoselov Street (СУН) from TK-94 to Houses 41 Bldg.2, 43, 45 Bldg. # 1, 2, 47 Bldg. 1, 49, 47 Bldg. 5 along Kollontay Street and to House 50 Bldg. 4 along Podvoyskogo Street.
    • quarter 51-51a North of Murinsky Creek (СМР) from TK-1 Section (86) to Houses: Uchitelskaya St., 19 Bldg. 1, 17 Bldg. 1, 15, 13 Bldg. 2, 19 Bldg. 2, 17 Bldg. 2 from Quarter K-2 to Houses: Lunacharskogo Prospect, 96 Bldg. 2, Ushinskogo St, 4, from TK-2 Section (90) to central heat distribution station at Uchitelskaya St, 11, to Houses: Svetlanovsky Prospect, 93, 91, Lunacharskogo Prospect, 92.
  36. Development of design documentation sections «Heating, Ventilation, Air Conditioning» for DAP dispatch center of the facility: «Construction of Western High-Speed Diameter Motorway. Second Phase of Construction of Western High-Speed Diameter Motorway (from junction with Krasnoputilovskaya Street to interchange near Ekateringofka River)".
  37. Development of section «Corrosion Protection» for heat supply network of the facility. Location: St. Petersburg, Bolshevikov Prospect, Section 1 (South-west of House 38 Bldg. 1 along Bolshevikov Prospect).
  38. Development of design project for relocation of oil pipeline DN 219 from under the track of reconstructed motorway M-5 «Ural» in the section between km 1480+000 - km 1494+000 near villages Russky Yurmash and Verny of Ufa Region, the Republic of Bashkortostan.
  39. Modernization (design and installation) of dual-cycle heating system with heating station in the gate house with guard rooms in "North-West Heat Power Plant" branch of JSC INTER RAO UES.
  40. Design projects: - development of design project documentation for heat supply network; development of design project documentation for external power supply and telephone communication network; development of design project documentation for external water supply and sewage system for construction of facility: «Stroitel» sports center, Novgorod Region, Okulovka, Teatralnaya St.».
  41. Design projects: - development of design project documentation for external gas supply; development of design project documentation for external water supply and sewage; selection of module gas boiler plant for facility heat supply; development of design project documentation for external power supply with reconstruction of cable lines 10 kV for construction of the facility: «Sports center with multipurpose indoor sports hall. Location: Starorussky Region, Staraya Russa, Tribuny Street».
  42. Development of design project documentation for gas metering assembly for JSC Krasnogorodskaya Experimental Paper Production Factory. Location: St. Petersburg, Krasnoye Selo, 1st May St, 2.
  43. Development of work project documentation for sections of individual heat supply stations (further on - IHS) for Buildings Е, F1, F2 and heat supply network from roof-top boiler plant in Building Е to HIS of Buildings Е, F1, F2. Location: Leningrad Region, Vsevolozhsk District, Zanevskoye Rural Settlement, Kudrovo Area, Lot 1.
  44. Repair and reconstruction works on heat-exchange equipment of St. Petersburg State Enterprise Sports Center «Physical Education and Health». Location: St. Petersburg, Moskovsky Prospect, 102.
  45. Collection of initial data, including technical specifications of the motorway owner; technical specifications of the Board of State Road Traffic Safety Inspection (UGIBDD) in Leningrad Region and exploratory design for access road to the Oil Storage Farm facility of CJSC Gazprom-neft North-West. Location: Leningrad Region, Tosnensky District, north-west of Gladkoye Settlement, at crossing of motorways Mga-Vyritza and Gladkoye-Nikolskoye.
  46. Development of modernization project for feed-water conditioning assembly at the Library of Russian Academy of Sciences – the Institution of the Russian Academy of Sciences. Location: St. Petersburg, Birzhevaya Line, 1.
  47. Development of design project documentation for relocation of external lighting network from construction site of facility. Location: St. Petersburg, Turbinnaya St, 5.
  48. Design and work project documentation for internal engineering systems and heat supply networks, external gas supply and gas boiler plant for construction of Multifunction Administrative, Trade and Storage Complex. Location: Moscow Region, Narofominsk District, near Petrovskoye Village.
  49. Correction of design project documentation in sections regarding heating, individual heat supply stations and heating network for multistorey residential buildings, construction Phases 1, 2 and 3. Location: Leningrad Region, Vsevolozhsk District, Kudrovo Village, Novy Okkervil, building position (Lot 12), building position (Lot 13).
  50. Development of design and work project documentation for self-contained heat supply (gas boiler plant) of Lahta-Olgino Municipal Government building.
  51. Development of design and estimate documentation for temporary power supply and electric lighting of construction site yard of Novovoronezh Nuclear Power Plant II (NV AES-2), located in Kashira District of Voronezh Region.
  52. Development of chapters «External Water Supply and Sewage Networks» and «Temporary Water Supply and Sewage Networks» of the facility. Location: Dermatovenerologic Dispensary No.4, St. Petersburg, Primorsky District, Bogatyrsky Prospect, Section 1 (south-west of House 12, Bldg. 2 А, along Baykonurskaya Street).
  53. Development of design project section «Checklist of Environmental Measures» for the facility. Location: St. Petersburg, Bolshevikov Prospect, 54, Bldg. 5 B.
  54. Development of design documentation for built-in 3MW gas boiler plant and internal gas pipeline to gas equipment of the facility. Location: St. Petersburg, Krestovsky Island, Yuzhnaya Road, 9 (near Yuzhny Pond).
  55. Development of design project section «Checklist of Environmental Measures» for clinker furnace No.3 of CJSC «METAHIM».
  56. Development of design project for relocation of mainline heat supply networks DN 1400 from under the construction track of motorway (from "North-West Heat Power Plant" branch of JSC INTER RAO UES to Primorskaya Boiler Plant of GUP "TEK SPb")
  57. Development of work project section «Corrosion Protection» for heat supply networks of GUP «TEK SPb», 2800 m, «Ulyanka» Quarter 11a
  58. Development of design documentation for protection of high pressure gas pipeline at crossing with access road to Multifunctional Sea Transshipment Complex Bronka (fire exit). Location: Lomonosov, Yevgeniya Yefeta St, Section 1

Projects 2017

Projects 2016

The year 2016 was quite difficult as for design branch in Russia in general, and for our organization in particular. Because of the general reduction of amount of works on design we have concluded only 31 contracts which main share - state.
Because of bad investment climate and economic sanctions the share of contracts with the developer companies was extremely insignificant.
This fact, and also economic events in Russia, became a reason for acceptance by our company "strategy of reduction of expenses" for the purpose of preservation of the leading engineering staff of experts, and deduction of positions in the design market.

Projects 2015

Despite a difficult economic situation in the country, 2015 was quite successful for our company. 48 new contracts were signed, and the share of the state and municipal contracts became much more, than in previous years.
It is explained by the general economic recession in Russia as a result of which many investment projects were stopped while implementation of address programs went under the voted budget.
Road design, development of project and working documentation on construction of water-heating boiler rooms, and also liquidation of hazardous production facilities in the different cities of our country such as: St. Petersburg, Apatity, Ufa, Kazan, Yekaterinburg, Krasnoyarsk, Arkhangelsk etc., became the main direction, in design and exploration work of our company in 2015.

Projects 2014

To summarize 2014, we can say that the direction vector of our activities and assigned work priorities selected by the company in 2012 are completely justified. 61 agreements and state contracts were signed with contractors by the Engineering Infrastructure Design Institute. Among our new partners are such large organizations as OJSC ALROSA-Gaz and FSBI Petersburg Nuclear Physics Institute named after B. P. Konstantinov. Almost the third part of the signed agreements is state contracts. This is a measure of complex execution of works by the specialists of our Institute, our competitive power and confidence placed to us on the part of the state organizations and institutes. And numerous favourable conclusions of the expertise of design and estimate documentation are the evidence of our qualification.

Projects 2013

75 new projects of state and investment financing are the result of the activities of our company for 2013. 2013 shows that the decisions made by us in the previous years and analysis of the Institute development prospects are true. Following this policy, we obtained new possibilities on the market of the design works and showed ourselves to good advantage both among private customers and in the district authorities of the Leningrad and Moscow Regions.

Projects 2012

For the Design Institute, 2012 is the year of discovery and deployment of new trends – out company has been authorized for work package on engineering surveys (topographical, geological engineering, engineering-ecological surveys, etc.) and also our Institute has been awarded the certificates of conformity of the ISO 9001-2008 quality management at development of design documentation and survey works.
A separate group of specialists on road engineering has been formed, by virtue of which the solution on new construction and reconstruction of motor roads in St. Petersburg, Leningrad Region and Naro-Fominsk are implemented.
In 2012 the Engineering Infrastructure Design Institute concluded 90 investment contracts and state contracts and in this connection the works are performed.

Projects 2011

In 2011 our company implemented 60 large projects in different regions of Russia. Our main customers were legal entities and enterprises of JSC INTER RAO UES. New direction on survey, calculation and installation of hanger-support pipeline system was launched in the Design Institute.

Projects 2010

In the year 2010 the Engineering Infrastructure Design Institute has entered into and is performing works under 58 agreements and contracts. In most cases, the projects are owned by investment and developer companies. The Institute has also broadened the geography of its activities, working at facilities in Western Siberia.

Projects 2009

In the year 2009 the Institute specialists completed design works under 34 private commercial and federal contracts. Almost all design project documentation received the necessary approvals in expert and sanctioning organizations and was passed on to be applied for construction and installation works. Company employees built 3 heat power facilities completing full work cycle from design and survey works to commissioning.

Projects 2008

Within the period from June till December 2008 the company implemented 19 package design contracts.
Main assignment – design of linear facilities during modernization of motor roads, design of electrochemical protection installations for underground pipelines.