Projects for 2011 year – boiler plants, heat and gas supply networks, water supply

Brief projects outline
In the course of its activity the Institute has gained extensive design work experience in construction of engineering infrastructure networks and power facilities at a wide range of locations.
Design documentation developed by the specialists of the Engineering Infrastructure Design Institute became the basis for construction and reconstruction of many facilities in the Russian Federation among which motorways, mainline and distribution gas and oil pipelines in the Central, North-West, Southern, Volga regions; heating networks, communications and telephony, power networks as well as water supply and sewerage networks of Moscow, Saint-Petersburg and Leningrad's area.
Our company designing the systems of electrochemical protection of underground utilities has provided protection of many tens of kilometers of underground utilities.
On the basis of drawn-up and approved by industrial safety expert review documentation on liquidation and preservation of hazardous production facilities hundreds of technical devices were decommissioned and excluded from the register.

Company projects — 2011

projects
2008

projects
2009

projects
2010

projects
2012

projects
2013

projects
2014

projects
2015

  1. External service network design (heating network, water supply and sewage, communication and telephone network, power supply, gas supply and outdoor lighting networks) of the facility: St. Petersburg, Territory of Quarter 7-17 "Sosnovaya Polyana", between Prospect Veteranov, Pogranichnika Gar’kavogo Street, and Prospect Narodnogo Opolcheniya, Lyetchika Pilyutova Street, in the Krasnoselsky District.
  2. Development of design documentation for external service networks, including the following divisions of the design project: external heating network, external water supply and sewage, outdoor electric lighting, external telephone communication and wired radio network, external gas supply network, external power supply lines from connection points, determined by connection terms and within the borders of the quarter at ‘project design documentation’ and ‘working documentation’ stages for reusable multi-bay houses part of residential complex construction project. Location: St. Petersburg, Kolpinsky District, Lagernoe Shosse.
  3. Organization of expertise of industrial safety of design documentation for external gas supply networks of the facility: "Phase 3 of Multifunctional Complex Construction Project. Location: St. Petersburg, Krasnogvardeysky District, Zanevskaya Square, Section 1, (west of House 71 Building 1 А, along Zanevsky Prospekt)"
  4. Works on execution of working project for relocation of gas pipeline electrochemical corrosion protection installation at the facility. Location: St. Petersburg, Central District, Zagorodny Prospect, 8, Liter B, and works on preparation of design documentation for disconnection and reconnection of gas pipeline electrochemical corrosion protection installations at the facilities. Locations: St. Petersburg, Central District, Zhukovskogo Street, 59-61, and Chernyakhovskogo Street, 32, Building 2.
  5. Performance of works on development of design and estimate documentation for Measures to Support Continuous System Water Circulation in the Main Heating System (MHS) of Petrozavodskaya Heat Power Plant. Location: Petrozavodsk, Pogranichnaya St, 25, Main Building of Petrozavoskaya Heat Power Plant, "Karelsky" Branch.
  6. Organization of expertise of industrial safety for a boiler house. Location: St. Petersburg, Ligovsky Prospect, 246.
  7. Development of design documentation for gas pipeline electrochemical protection installation for CJSC "Severny Gorod" facility. Location: St. Petersburg, Savushkina St, 7, Building 3, Liter A.
  8. Development of design documentation for liquidation of 3 hazardous production facilities (gas boiler house equipment). Locations:
    St. Petersburg, Nevsky Prospect, 65;
    St. Petersburg, Shpalernaya St, 6-8;
    St. Petersburg, Shpalernaya St, 13 and organization of expertise of industrial safety for design documentation of the above listed facilities.
  9. Development of design documentation for gas boiler house, liquefied gas storage plant, main gas and heating pipelines for the production storage facility. Location: Leningrad Region, Vsevolozhsky District, Zanevskaya Volost', Zanevka Village.
  10. Development of design documentation for rearrangement of outdoor lighting networks within the area of housebreaking and new house construction. Location: St. Petersburg, Bumazhnaya St, 8 A.
  11. Modernization of crude oil deposit enabling protection of downhole pumping equipment, production casing and tubing at the deposits of JSC NK Rosneft in the Yamalo-Nenets Autonomous District, Gubkinsky Town.
  12. Design works for the facility of OJSC Lenenergo – "Luzhskiye Electric Networks" branch: "Reconstruction of electric boiler plant RPB-IV in the town of Luga"
  13. Inspection of station hanger-support pipeline system for the needs of Abakanskaya Heat Power Plant branch of INTER RAO UES of Russia.
  14. Works on development of design documentation for external heat and power supply of boiler plant for OOO "First Wood Treating Plant" (Pervy Derevopropityvayuschy Zavod). Location: 187110, Leningrad Region, Kirishi, Volkhovskoye Shosse, 11.
  15. Development of design project for reconstruction of gas pipeline electrochemical protection installation. Location: St. Petersburg, Moskovsky Prospect, Section 1 (south-east of House 65а, Liter A along Moskovky Prospect).
  16. Development of design documentation for liquidation of 2 hazardous production facilities – gas boiler houses. Location: St. Petersburg, Central District, Pereulok Dzhambula, 17, Liter B, Offices 3N, 5N; Zagorodny Prospect, 19 and monitoring during expertise of industrial safety of design documentation for the above listed facilities.
  17. Development of working documentation for GUP TEK SPb facility concerning reconstruction of 6th Krasnoselskaya boiler plant (Politruka Pasechnika St, 16/4) including installation of an auxiliary mainline pump.
  18. Development of design documentation for ‘Relocation of lighting system and contact system mast from below the shaft construction spot 14’ at the facility: "Construction of Backup Sewage Collector from Vernosti St to Murinsky Ruchey near Ploschad’ Muzhestva". Location: St. Petersburg, Sofyi Kovalevskoy St, between Buildings 7 and 11
  19. Work on development of "Environmental Safety" and "Construction Organization Project" sections of design documentation for a boiler plant. Location: St. Petersburg, Kolpino, Lagernoye Shosse, 57 A"
  20. Work on development of design and working documentation:
    – separate 7.5 MW automated gas water boiler for heating supply of "Residential Complex with Boiler Houses and Transformer Substations. Location: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate, building position 11 (LOT No.11), construction stages I and II, and the general education school. Location: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate, building position 17 (LOT No. 17) in accordance with the Technical design assignment (Annex No.3 hereto) and the applicable regulatory documents;
    - external medium pressure gas supply network for the separate gas boiler plant.
  21. Work on development of design documentation for liquidation of hazardous production facility – casting shop of "Vodopribor"Plant. Location: Moscow, Novoalekseevskaya St, 16.
  22. Work on development of design documentation for gas boiler plant equipment. Location: St. Petersburg, Ligovsky Prospect, 246, and the external gas pipeline thereto.
  23. Development of "External water supply and sewage network" section of project design documentation for the facility: "Designed fire station at the crossing of Novoselov and Severnaya Streets in the Western construction area of the Town of Gatchina".
  24. Development of design documentation for high pressure gas pipeline electrochemical protection installation for the facility. Location: St. Petersburg, Boksitogorskaya St, from gas-distributing point GDP No.104 to Stasovoy St.
  25. Development of design documentation for the following sections: Heating and ventilation, Water supply and sewage, Individual heating plant ITP (2 items), Energy efficiency, Environmental safety, External water supply and sewage networks, Heating networks for construction of multi-storey apartment buildings with built-in rooms, boiler house and transformer substations. Location: Leningrad Region, Vsevolozhsk District, Kudrovo Village, Novy Okkervil Housing Estate, building position 11 (LOT No.11).
  26. Development of design project for liquidation of hazardous production facility (boiler house, chimney stack, mechanical annex and gas-consuming equipment). Location: St. Petersburg, Smolny Prospect, 17 A.
  27. Design works on execution of design documentation for relocation of gas pipeline electrochemical corrosion protection installation at the facility. Location: St. Petersburg, Chernyakhovskogo St, 7.
  28. Works on engineering project for development and approval of design project for physical planning of "Petromaster" Trade and Service Center. Location: Leningrad Region, Gatchinsky District, Bolshie Kolpany Village, 53rd km of Kievskoye Shosse, Section 5
  29. Design project documentation for liquidation of hazardous production facility (gas boiler plant). Location: St. Petersburg, Central District, Fontanka River Emb, 46 M.
  30. Works on development of design documentation (Stages "Design Project" and "Working Documentation") for external water supply and sewage network, telephone communication and wired radio network of the facility – the apartment-type hostel. Location: St. Petersburg, Strelna Settlement, Teatralnaya Alley, 15
  31. Execution of "External gas supply" section of working documentation for construction of multi-storey residential buildings with built-in rooms, boiler house and transformer substations. Location: Leningrad Region, Vsevolozhsk District, Kudrovo Village, Novy Okkervil Housing Estate, building position 12 (Lot No.12), building position 13 (Lot No.13).
  32. Development of working documentation for external wired radio network within the borders of the "Multilevel Parking" area. Location: St. Petersburg, Krasnogvardeysky District, Pr. Kosygina, Sector 1 (south-east of crossing with Industrialny Prospekt).
  33. Work on development of design and working documentation for relocation of engineering networks (outdoor lighting networks, contact system) from under the facility construction site: "Phase 3 of Multifunctional Complex. Location: St. Petersburg, Krasnogvardeysky District, Zanevskaya Square, Section 1, (west of House 71 Building 1 А, along Zanevsky Prospect)".
  34. Development of design documentation for heating network input at the facility: Leningrad Region, Kirovsk, Kirovskaya Children and Youth Football School.
  35. Work on development of design documentation for relocation of gas pipeline electrochemical protection installations beyond the construction site of the retail complex. Location: St. Petersburg, Petrogradsky District, Podkovyrova St, Section 1 (south-east of House 8 along Podkovyrova St)
  36. Development of "Contact System" section of working documentation for the facility: Construction of Administrative Building for Federal Arbitrary Court. Location: St. Petersburg, Yakubovicha St, 6 A
  37. Works on execution of hydraulic calculations of heat supply network. Location: Samara Region, Zhigulevsk Urban District, Moskvashinskaya St, 38, Boiler Plant No. 13
  38. Development of design documentation for low pressure gas pipeline electrochemical protection installation for the facility. Location: St. Petersburg, Quarter 17 Shuvalovo-Ozerki, Esenina St, 26, (Bld. 1 and Bld. 2); House 28 (Bld. 1 and Bld. 2).
  39. Execution of hydraulic calculations of heat supply network. Location: Samara Region, Zhigulevsk Urban District.
  40. Work on development of "Insulation Calculation" section of working documentation for the administrative building of the facility. Location: St. Petersburg, Fontanka River Emb, Section 1 (south-west of House 9 A along Klimov Lane).
  41. Works on development of design documentation "Promenade Terrace extended from 1st Berezovaya Alley in St. Petersburg, Petrogradsky District, Krestovka River Emb, 5".
  42. Development of design project solutions for modernization of internal fire-fighting main at the Main building of "North-West Heat Power Plant" branch of OJSC INTER RAO UES.
  43. Calculation, performance of start-up operations and repairs of hanger-support pipeline system (HSS) of 450 MW unit of "North-West Heat Power Plant" branch of OJSC INTER RAO UES.
  44. Work on execution of design documentation section "Corrosion Protection" for external pipelines of the facility: "Motorway section connecting the Western High-Speed Diameter junction from the Ekateringofka River Embankment to the northern part of the Obvodny Channel".
  45. Work on execution of design documentation for liquidation of hazardous production facility (gas boiler plant and diesel fuel storage). Location: St. Petersburg, Dobrolubova St, 14.
  46. Development of "Corrosion Protection" section in the design project for relocation of heat supply network from under the construction site area. Location: St. Petersburg, Malaya Desyatinnaya St, Section 1(south-east from crossing with Novoutinaya St).
  47. Development of "Outdoor lighting" section of design documentation for the facility including residential building with built-in annexed rooms and a parking area. Location: St. Petersburg, Vasileostrovsky District, Zheleznovodskaya St, 32 A.
  48. Work on development of design documentation for relocation of external water supply and sewage network, heat supply network, telephone communication and cable power lines, as well as gas pipeline electrochemical protection installation from under the construction area of multi-apartment residential building with built-in rooms and underground parking. Location: St. Petersburg, Peredovikov St, 24
  49. Development of design project for reconstruction of gas pipeline electrochemical corrosion protection installations at the facility. Location: St. Petersburg, Nevsky District, Krupskoy St, 7, to relocate them from under the construction site of the project "Reconstruction of Building for Magistracy. Location: St. Petersburg, Nevsky District, Krupskoy St, 9 A".
  50. Work on development of design documentation for parent heat supply stations and organizing their approval by GUP TEK SPb. Locations: Prospect Prosvescheniya, 86, Building 2 (City Heat Transfer Station GTP 2), Prospect Prosvescheniya, 86, Building 3 (GTP 1), Grazhdansky Prospect, 126, Building 3 (GTP w/o No.), Grazhdansky Prospect, 130, Building 2 (GTP 6), Suzdalsky Prospect, 103 (GTP 4), Suzdalsky Prospect, 107 (GTP 5) as part of state contract: "Work on development of design documentation for reconstruction of heat supply networks in Quarter 47 north of Murinsky Ruchei".
  51. Design of heat supply input at the facility: Municipal Educational Institution of Extended Education for Children "Kirovskaya Children and Youth Football School". Location: Leningrad Region, Kirovskiy District, Kirovsk, Sovetskaya St, 1
  52. Development of design documentation (stages "Design" and "Development") for relocation of DC cable lines, and relaying of power cables, remaining within the borders of the lot and the construction work area for the facility "Multilevel Parking." Location: St. Petersburg, Krasnogvardeysky District, Kosygina Prospect, Sector 1 (south-east of crossing with Industrialny Prospekt).
  53. Development of combined plan of external engineering utility networks and the section of design documentation concerning "Energy Efficiency" of the facility. Location: St. Petersburg, Fontanka River Emb, Section 1 (south-west of House 9 A along Klimov Lane).
  54. Work on development of design documentation for heavy air compressor station and organization of design documentation industrial safety expertise of the facility: Lodeynoe Pole, Non-alcoholic beverages plant, CJSC "Svir".
  55. Development of schematic engineering diagram for Quarters 3, 5 of Yuntolovo Project. Location: St. Petersburg, 3rd Konnaya Lahta, Sections 2, 3, 4 (north-west of House 45 D along 3rd Konnaya Lahta)
  56. Introduction of changes to design documentation for gas distribution unit (GRU) of nonferrous casting plant of CJSC TRANSKAT. Location: St. Petersburg, Kolpino, Lenina Prospect, 1 according to order of Rostekhnadzor Directorate for the Northwest Federal District.
  57. Development of design documentation for reconstruction of external gas pipeline for facility boiler house: St. Petersburg, Petrogradsky District, Kamenoostrovsky Prospect, 10 (LENFILM Film Studios)
  58. Development of working documentation for external heat supply network for the facility: "Administrative Building of Arbitrary Court of the City of St. Petersburg and Leningrad Region." Location: St. Petersburg, Smolnogo St, 6 A"
  59. Execution of design documentation for liquidation of hazardous production facility – production buildings of phosphate manufacturing plant. Location: Leningrad Region, Kingiseppsky District, Kingisepp, Phosphorit Industrial Zone, and organization of design documentation industrial safety expertise.
  60. Development of design and working documentation for relocation of DC cables, remaining within the borders of the lot and the construction work area for the facility "Multilevel Parking" according to Technical Conditions (TC) of SPb GUP Gorelectrotrans. Location: St. Petersburg, Krasnogvardeysky District, Kosygina Prospect, Sector 1 (south-east of crossing with Industrialny Prospect)

Projects 2017

Projects 2016

The year 2016 was quite difficult as for design branch in Russia in general, and for our organization in particular. Because of the general reduction of amount of works on design we have concluded only 31 contracts which main share - state.
Because of bad investment climate and economic sanctions the share of contracts with the developer companies was extremely insignificant.
This fact, and also economic events in Russia, became a reason for acceptance by our company "strategy of reduction of expenses" for the purpose of preservation of the leading engineering staff of experts, and deduction of positions in the design market.

Projects 2015

Despite a difficult economic situation in the country, 2015 was quite successful for our company. 48 new contracts were signed, and the share of the state and municipal contracts became much more, than in previous years.
It is explained by the general economic recession in Russia as a result of which many investment projects were stopped while implementation of address programs went under the voted budget.
Road design, development of project and working documentation on construction of water-heating boiler rooms, and also liquidation of hazardous production facilities in the different cities of our country such as: St. Petersburg, Apatity, Ufa, Kazan, Yekaterinburg, Krasnoyarsk, Arkhangelsk etc., became the main direction, in design and exploration work of our company in 2015.

Projects 2014

To summarize 2014, we can say that the direction vector of our activities and assigned work priorities selected by the company in 2012 are completely justified. 61 agreements and state contracts were signed with contractors by the Engineering Infrastructure Design Institute. Among our new partners are such large organizations as OJSC ALROSA-Gaz and FSBI Petersburg Nuclear Physics Institute named after B. P. Konstantinov. Almost the third part of the signed agreements is state contracts. This is a measure of complex execution of works by the specialists of our Institute, our competitive power and confidence placed to us on the part of the state organizations and institutes. And numerous favourable conclusions of the expertise of design and estimate documentation are the evidence of our qualification.

Projects 2013

75 new projects of state and investment financing are the result of the activities of our company for 2013. 2013 shows that the decisions made by us in the previous years and analysis of the Institute development prospects are true. Following this policy, we obtained new possibilities on the market of the design works and showed ourselves to good advantage both among private customers and in the district authorities of the Leningrad and Moscow Regions.

Projects 2012

For the Design Institute, 2012 is the year of discovery and deployment of new trends – out company has been authorized for work package on engineering surveys (topographical, geological engineering, engineering-ecological surveys, etc.) and also our Institute has been awarded the certificates of conformity of the ISO 9001-2008 quality management at development of design documentation and survey works.
A separate group of specialists on road engineering has been formed, by virtue of which the solution on new construction and reconstruction of motor roads in St. Petersburg, Leningrad Region and Naro-Fominsk are implemented.
In 2012 the Engineering Infrastructure Design Institute concluded 90 investment contracts and state contracts and in this connection the works are performed.

Projects 2011

In 2011 our company implemented 60 large projects in different regions of Russia. Our main customers were legal entities and enterprises of JSC INTER RAO UES. New direction on survey, calculation and installation of hanger-support pipeline system was launched in the Design Institute.

Projects 2010

In the year 2010 the Engineering Infrastructure Design Institute has entered into and is performing works under 58 agreements and contracts. In most cases, the projects are owned by investment and developer companies. The Institute has also broadened the geography of its activities, working at facilities in Western Siberia.

Projects 2009

In the year 2009 the Institute specialists completed design works under 34 private commercial and federal contracts. Almost all design project documentation received the necessary approvals in expert and sanctioning organizations and was passed on to be applied for construction and installation works. Company employees built 3 heat power facilities completing full work cycle from design and survey works to commissioning.

Projects 2008

Within the period from June till December 2008 the company implemented 19 package design contracts.
Main assignment – design of linear facilities during modernization of motor roads, design of electrochemical protection installations for underground pipelines.