Projects for 2012 year – boiler plants, heat and gas supply networks, water supply

Brief projects outline
In the course of its activity the Institute has gained extensive design work experience in construction of engineering infrastructure networks and power facilities at a wide range of locations.
Design documentation developed by the specialists of the Engineering Infrastructure Design Institute became the basis for construction and reconstruction of many facilities in the Russian Federation among which motorways, mainline and distribution gas and oil pipelines in the Central, North-West, Southern, Volga regions; heating networks, communications and telephony, power networks as well as water supply and sewerage networks of Moscow, Saint-Petersburg and Leningrad's area.
Our company designing the systems of electrochemical protection of underground utilities has provided protection of many tens of kilometers of underground utilities.
On the basis of drawn-up and approved by industrial safety expert review documentation on liquidation and preservation of hazardous production facilities hundreds of technical devices were decommissioned and excluded from the register.

Company projects — 2012

projects
2008

projects
2009

projects
2010

projects
2011

projects
2013

projects
2014

projects
2015

  1. Geotechnical, topographical, engineering-ecological surveys for the facility: Project for external heating networks at the stage of design and working documentation from the boiler Grazhdanskaya to the area limited by Marshala Blukhera Prospect, Laboratorny Prospect, Bestuzhevskaya Str., Kushelevskaya Road with shutdown of the boiler plant on Laboratorny Prospect, House 18/ 2 A.
  2. Development of documentation for liquidation of a hazardous production facility – oxygen sink VSS-10, JSC Rossiya Airlines, Pulkovo Airport facility.
  3. Development of working documentation “External gas supply” – protection of the existing gas pipeline of high pressure at crossing of motor roads and passages at the facility: “Multi-purpose shopping mall”, address: Leningrad Region, Gatchina, Severnaya Vjezdnaya zona, at crossing of Leningradskoye and Krasnoselskoye Shosse, sections 2, 3.
  4. Development of design and working documentation of motorway (section of roundabout) from Volodarskogo Str. (McDonald's) to Ploschad Svobody Str. (to crossing with Kalinina Str.), Naro-Fominsk, Moscow Region.
  5. Development of project for traffic organization at station Nara in Naro-Fominsk, Moscow Region.
  6. Development of design documentation for liquidation of hazardous production facility – gas burner Maxon, location: Leningrad Region, Tosno, Moskovskoye shosse, 1.
  7. Geotechnical, topographical, engineering-ecological surveys for development of design documentation of the facility: “Gas pipeline branch and и automated gas distribution station for gas supply of the airport boiler, Norilsk”.
  8. Development of design documentation for steam pipeline 325 m long (DN 300, 200 mm) of the digestion section of the alumina shop, CJSC “BazelCement-Pikalyovo”, Pikalyovo, Leningrad Region.
  9. Development of “Modification of utilities. Protection of gas pipelines against electrochemical corrosion” section for development of design documentation for the facility: Construction of Finlyandskaya Str. from Sovetsky lane to Sofiyskaya Str., Saint-Petersburg.
  10. Development of design and estimate documentation for reconstruction of the section of heating main No. 2 2DN 630 mm with PU foam insulation with the ORC system, with the length of 1223 running meters with increase of diameter by 2DN 800 mm along Shirotnaya Str., Tyumen.
  11. Development of working documentation for protection of gas pipeline against electrochemical corrosion of the facility: “Reconstruction of gas pipelines of medium and low pressure. Location: block 24 M. Okhta (Novocherkassky Pr. – Tallinskaya Str. – Shaumyana Pr. – Zanevsky Pr.)”, Saint-Petersburg.
  12. Engineering-ecological surveys for construction of a facility – Citroёn Showroom, Location: Saint-Petersburg, Pulkovskoye shosse, 70.
  13. Development of design, working documentation for electrochemical protection of LPG storage tanks (propane/butane mix). Location: Saint-Petersburg, Torfyanaya doroga Str., 9
  14. Development of design documentation for liquidation of a hazardous production facility – fuel-oil storage tank, CJSC “Nord-Sintez”. Location: Leningrad Region, Vyborg District, Lesogorsky Village, Lenshosse, 23.
  15. Development of design documentation for liquidation of a hazardous production facility – casting shop, OJSC “Ravenstvo”, Saint-Petersburg.
  16. Field supervision over relocation of external utilities of water supply pipeline and sewerage from under facility building footpoint: “Stage III of multi-purpose complex, location: Saint-Petersburg, Krasnogvardeysky District, Zanevskaya ploschad, section 1, (to the west of House 71/1 А, along Zanevsky Pr.)”.
  17. Field supervision of construction of motorway to the construction site: “Light oil store, CJSC “Gazprom Neft-Severo-Zapad”. Location: Leningrad Region, Tosnensky District, to the north-west of Gladkoye Village, at crossing of motorways – “Mga-Vyritsa” and “Gladkoye-Nikolskoye”.
  18. Development of technical documentation for liquidation of hazardous production facilities: 2 steam boilers DE 25-14; pressure vessels - 5 pcs., air collector - 7 pcs., vessels-hydraulic accumulators of the facility, “NTTs Anklav”, LLC.
  19. Development of design documentation for liquidation of hazardous production facilities, CJSC “Tyumen Plant of Plastic Materials” (Tyumensky Zavod Plastmass). Location: Tyumen, Pervomayskaya Str., 54
  20. Development of design and working documentation for reconstruction of motorway along Voykova Str., Privokzalny microDistrict, Naro-Fominsk, Moscow Region, with reconstruction of gas supply and power supply networks, sewerage networks and heat supply networks.
  21. Development of design documentation of traffic organization from Volodarskogo Str. (McDonald's) to Ploschad Svobody Str. (to crossing with Kalinina Str.), Naro-Fominsk, Moscow Region.
  22. Development of design documentation of external intra-site utilities – heat supply networks, external gas supply, outdoor lighting, power supply networks and telephone networks within the facility: "Apraksin Dvor". Location: Saint-Petersburg, Central District, Sadovaya Str., 28-30, bldg. 1-57, 62 for social and business multipurpose complex.
  23. Development of design and working documentation for electrochemical protection of steel gas pipeline and steel cases at the facility: “Construction of HP gas pipeline connection along future continuation of Parashutnaya Str. and Ring Motorway from Shuvalovskogo Pr. to Gorskoye shosse”.
  24. Development of working documentation “Heating, ventilation and air conditioning”, “Water supply and sewerage” and “Individual heating plant with heating energy meter station”. Location: Saint-Petersburg, Fontanka River Emb., Section 1 (to the south-west of House 9 А along Klimov Lane).
  25. Development of design documentation for liquidation of hazardous production facilities: boiler, residual fuel oil storage area, ammonia refrigerating plant of the facility, OJSC “Luga meat-processing factory”
  26. Work on development of design documentation of the facility: “Arrangement of temporary motorway to the temporary material storage area with arrangement of entry/exit to the Primorskoye shosse. Location: Primorsky District, Primorskoye shosse, 1st Lugovaya Str.
  27. Work on development of design documentation for liquidation of the hazardous production facility - fuel-oil storage tank with reserve fuel for the boiler, OJSC “Kazan Plant “Elektropribor”.
  28. Work on development of design documentation (Stages “Design Project” and “Working documentation”) for gas supply of warehouse complex of the land plot. Location: Saint-Petersburg, Moskovsky administrative District, Zastavskaya Str., Section I (to the north of House 3 A along Zastavskaya Str.)
  29. Development of working documentation for temporary power supply of sites at the land plots located in block 7-17 of Sosnovaya Polyana.
  30. Work on development of documentation for liquidation of the hazardous production facility – foundry furnace, OJSC “Santekhpribor”. Location: Kazan, Klary Tsetkin Str., 18/20.
  31. Development of technical (design) documentation for liquidation of the hazardous production facility – 2 fuel-oil storage tanks (200 m3), 2 fuel-oil storage tanks (100 m3), fuel oil drain rack of the facility, FGKU “Neva”, Federal State Reserve Agency. Location: Leningrad Region, Gatchinsky District.
  32. Work on development of design documentation for electrochemical protection of gas pipeline of the facility: “Construction of entrance halls and underground passages for metro station “Slavy-1” (to the south of crossing of Slavy Pr. and Bukharestskaya Str.), “Slavy-2” (to the south of crossing of Yuzhnoye shosse and Bukharestskaya Str.)”.
  33. Work on development of design and working documentation for business-center location on the land plot of 3235.0 sq.m.: Saint-Petersburg, Frunzensky District, Sofyiskaya Str., House 8/1 A, including the following sections:
    • “Power supply and electric lighting system, lightning protection”;
    • “Water supply and water disposal” (household/domestic and fire pipelines);
    • “Heating, ventilation, smoke removal and air conditioning”;
    • “Individual heating plant and heating energy meter station”;
    • “Automatic fire fighting system”;
    • “Energy efficiency. Energy certificate”.
  34. Design documentation for liquidation of the hazardous production facility, OJSC “Norilskgasprom” – “Gas condensate processing plant” in Dudinka.
  35. State contract on surveys and development of documentation for liquidation of the hazardous production facility in the territory of the Smolny group of buildings.
  36. Development of design documentation for construction of gas boiler of 20 MW and external gas supply networks for “Residential Complex with Boiler Houses and Transformer Substations”. Location: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate, building position 11 (LOT 11), construction stage III.
  37. Work on development of design documentation for external water supply and sewerage networks of the production and assembling section. Location: Saint-Petersburg, Kirovsky District, the Road to Turukhtannye ostrova, 20/1 А.
  38. Development of design, working documentation for electrochemical protection of gas pipeline of the facility: “Gas supply of the boiler. Location: Vsevolozhsky Administrative District, Leningrad Region, Murino Village, the land of Agricultural Joint-Stock Company “Ruchji”, Section 1, cadastral number 47:07:07-22-001:0079”.
  39. Work on development of design and estimate documentation for reconstruction of the heating main section of TETS-1 – “Kolyuschenko” along Goncharenko Str. in Chelyabinsk from TK20 to TK20-2 with PU foam insulation, 4DN 800 mm.
  40. Development of design documentation for liquidation of hazardous production facilities – warehouse of bulk storage of flour and elevator equipment of the OJSC “LANA Bread-Baking Complex” facility and industrial safety expert review of design documentation with following approval in the RF Rostekhnadzor.
  41. Development of design and working documentation for reconstruction of electrochemical protection of gas pipelines due to relocation of its units from under building footprint: Pre-school educational institution, Ulyanka, Quarter 1, bldg. 87.
  42. Work on development of design documentation for liquidation of the hazardous production facility – elevator equipment (8 pcs.) of the buildings of OJSC “Moscow Non-Ferrous Metal Working Plant”. Location: Moscow, Serpukhovsky Val, 19.
  43. Development of design documentation for liquidation of hazardous production facilities of the South-Tambey gas condensate field in the Yamalo-Nenets Autonomous District - tank farm (field) of the South-Tambey gas condensate field (14000 m3), enterprise gas consumption system, gas distribution station of gas and gas condensate production shop, main gas pipeline section of gas and gas condensate production shop and support of industrial safety expert review approval in the Federal Service for Environmental, Technological and Nuclear Supervision.
  44. Work on development of design documentation for preservation of hazardous production facilities – tanks and pipelines of the fuel-oil storage tank (2 tanks of 1000 m3 and 2 tanks of 500 m3) in Luga, as well as organization of industrial safety expert review with its approval in the RF Rostekhnadzor.
  45. Development of design documentation of electrochemical protection of water supply networks of the facility: “Construction of electric multiple unit stock for maintenance of electric trains “Deziro” at the Podmoskovnaya station of the Moscow railways as per title: “Construction of electric multiple unit stock for maintenance of electric trains at the Podmoskovnaya station of the Moscow railways and organization of servicing points in the existing electric multiple unit stock of the Moscow railway terminal”.
  46. Design work for CJSC “YIT Saint-Petersburg” on development and approval of sections of design and working documentation for external water supply and sewerage networks of the apartment building with integrated-attached premises and parking. Location: Saint-Petersburg, Krasnoputilovskaya Str., 113/2 A.
  47. Work on design, equipment supply, installation and construction and commissioning operations for reconstruction of the individual heating unit of the “Administrative building” and “Engineering and Household building” of the “Severo-Zapadnaya TETS” branch of JSC INTER RAO UES.
  48. Work on development of design documentation for disconnection of external gas pipeline with installation of a plug to the facility. Location: 115230, Moscow, Elektrolitny Lane, 16, as well as organization of design solutions approval in SUE “Mosgaz”.
  49. Work on development of design documentation for liquidation of hazardous facility of OJSC “AMMOFOS” – a group of tanks and handling facilities for fuel station of the freight shop. Location: Cherepovets, Vologda Region, Severnoye shosse, 75
  50. Work on design documentation for liquidation of hazardous production facility:.
    The hazardous production facility under liquidation includes the following:
    - oxygen filling header for 8 balloons
    - nitrogen filling header for 4 balloons
    - oxygen pipeline L=1130 m, Р=15 atm
    - nitrogen pipeline L=1130 m, Р=15 atm
    - oxygen receivers V-9300 l, Рop.=150 kg/cm2 (3 pcs.)
    - oxygen receivers V-10 m3, Рop.=150 kg/cm2 (5 pcs.)
    - nitrogen receivers V-10 m3, Рop.=150 kg/cm2 (2 pcs.)
    of OJSC “GOZ Obulhovsky Zavos”. Location: Saint-Petersburg, Obukhovskoy Oborony Pr., 120 as well as organization of industrial safety expert review of design documentation with its approval and registration in the Rostekhnadzor North-West Directorate.
  51. Work on development of design documentation for protection of communication cable in the area of parking and entrance/exit to the section within the land plot located: Saint-Petersburg, Pushkinsky District, Shushary Village, Badaevskoye department, section 164.
  52. Design work on liquidation of hazardous production facility – boiler of “Babkoks-Vilkoks” type 16/13 with feed-water economizer.
  53. Work on design development for liquidation of hazardous production facility of autogas filling station in Yaroslavl.
  54. Development of design documentation for liquidation of hazardous production facility – casting shop, OJSC “Ravenstvo”, Saint-Petersburg.
  55. Work on development of design documentation for liquidation of hazardous production facility – cyanidation section of electroplating shop of OJSC “MKB Fakel”, Khimki
  56. Work on development of working documentation “Electrochemical protection against corrosion” of gas pipeline under reconstruction, “PeterburhGaz” LLC: “Construction of motorway Moscow-Saint-Petersburg at section 58 km - 684 km (with the following operation on a paid basis), stage 8 646 km – 684 km, preparation of the construction site”, Saint-Petersburg, Leningrad Region.
  57. Work on development of design and working documentation “Technical upgrade of main steam pipeline of the southern input from “Novo-Ryazanskaya TETS”, LLC to “RNPK”, CJSC” and assistance at industrial safety expert review of design documentation.
  58. Development of design documentation for liquidation of 2 hazardous production facilities: aluminum casting shop, area for separation of compressed air into oxygen. Location: Saint-Petersburg, Professora Kachalova Str., 3, as well as organization of industrial safety expert review of design documentation with its approval and registration in the Rostekhnadzor North-West Directorate.
  59. Work on repair and maintenance of hanger-support pipeline system of 450 MW unit for needs of "Severo-Zapadnaya TETS" branch, OJSC INTER RAO UES.
  60. Work on development of design documentation for disassembly of buildings and facilities of II stage of butyl alcohols production shop excluded from production process, in the territory of the existing butyl alcohols production shop of CJSC “Sibur-Khimprom”. Location: Perm, Promyshlennaya Str. 6
  61. Work on development of design documentation for liquidation of hazardous production facilities (ammonia production, stacks, TPP, lifting equipment). Location: Saint-Petersburg, Moskovskoye shosse, 13 (“SAMSON” Works).
  62. Development of design documentation for electrochemical protection of HP gas pipeline. Location: Leningrad Region, Vsevolozhsky District, Murino Village, Sadovaya Str.
  63. Development of design documentation for liquidation of hazardous production facilities: gas-consuming and thermal mechanical equipment of boiler and stack, brick kiln, gas distribution point. Location: 115230, Moscow, Elektrolitny Lane, 16, as well as organization of industrial safety expert review of design documentation with its approval in the RF Rostekhnadzor and elimination of HPF from the register.

  64. Design work on modernization of process pipelines tracers of “Severo-Zapadnaya TETS”, OJSC INTER RAO UES.
  65. Work on design documentation for liquidation of hazardous production facility: gas control unit of low pressure
    gas control unit of low pressure
    low pressure interplant gas pipeline
    metal arc cutting points (10 pcs.) of OJSC “GOZ Obulhovsky Zavos”. Location: Saint-Petersburg, Obukhovskoy Oborony Pr., 120 as well as organization of industrial safety expert review of design documentation with its approval in the RF Rostekhnadzor.
  66. Work on preparation of technical specifications for border crossing of “Schneider Electric ElektroMonoblok Zavod”, LLC road to the industrial warehouse complex “PO Metallist” road.
  67. Development of design documentation for reconstruction of electrochemical protection of gas pipelines of low and medium pressure. Location: Saint-Petersburg, Pushkin, Gusarskaya Str., 4.
  68. Development of design documentation for liquidation of the hazardous production facility – fuel-oil storage tank. Location: Saint-Petersburg, Kurchatova Str., 10, as well as organization of industrial safety expert review with the further elimination from the register of HPFs.
  69. Work on development of design documentation of external sewerage system as to disposing of rainwater to the lay of land of nine-story 53 apartment house No. 76 with integrated-attached premises in Quarter 8 of West District of Gatchina.
  70. Development of design documentation for liquidation of the hazardous production facility – fuel-oil storage tank. Location: Kazan, K. Tsetkin Str., 18/20.
  71. Work on development of working documentation of relocation of anode grounding circuit from electrochemical protection of gas pipeline. Location: Saint-Petersburg, Razyezzhaya Str., 35.
  72. Development of working documentation of “Corrosion protection” section as a part of the heating networks project. Location: Saint-Petersburg, Razyezzhaya Str., 37; Saint-Petersburg, Stremyannaya Str., 22/3; Saint-Petersburg, Dzhambula Lane, 17 (from TK-2 to Central Heating Station); Saint-Petersburg, Dzhambula Lane, 17 (from Central Heating Station to consumers); Saint-Petersburg, Tchaikovskogo Str., 10.
  73. Development of design and working documentation of external heat supply network: Closed sports complex without viewing stands (sports and fitness complex) attached to State Educational Establishment Secondary General School No. 305. Address: Saint-Petersburg, Frunzensky District, Section 1 (south-east of the crossing with Fuchika Street).
  74. Development of design documentation of utilities (external water supply and sewerage networks) as well as internal utilities – “Water supply and water disposal” section: Closed sports complexes without viewing stands. Location: Saint-Petersburg, Babushkina Str., Section 1 (north-east of the crossing with Dudko Street) and Peredovikov Str., Section 1 (west of the crossing with Entuziastov Pr.).
  75. Work on development of design documentation of relocation of utilities (external power supply networks, sewerage networks) from under the construction site: Closed sports complex without viewing stands (sports and fitness complex). Location: Saint-Petersburg, Frunzensky District, Budapeshtskaya Str., Section 1 (south-east of the crossing with Fuchika Street).
  76. Development of design and working documentation, “External heat supply networks” Section from the boiler to the school, location: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate.
  77. Working documentation sections:
    - External water supply and water disposal networks;
    - Internal water supply and water disposal networks;
    - Heating;
    - Ventilation. Smoke protection;
    - individual heating unit (2 pcs.), heating energy meter station (2 pcs.);
    - Heating Networks
    for construction of multistory apartment house with integrated-attached premises, boiler and transformer substations. Location: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate, building position 11 (LOT 11), construction stage I and II.
  78. Work on development of design documentation for corrosion protection of heat supply networks (ORC systems for insulation damping). Location: Marshala Kazakova distribution station TK-2 the right, TK-4 right, TK-5 right quarter 1а of “South-West” District and distribution station of quarters 7-12 of “South-West” District TK-6 right; Primorskaya distribution station TK-9 right; quarter 6 of “South-West” District.
  79. Development of design documentation for preservation of hazardous production facility – two receivers for hydrogen storage and electrolysis plant with electrolysis unit SEU-4M at the facility “Dubrovskaya TETS”, OJSC “TGK-1”.
  80. Development of detail design for reconstruction of electrochemical protection of gas pipeline of medium and low pressure. Location: Saint-Petersburg, Dobrolyubova Pr., 15.
  81. Work on development of detail design for protection of gas pipeline against electrochemical corrosion of the facility: “Reconstruction of gas pipelines of medium and low pressure. Location: Ivana Chernykh Street from bldg. 27 to Rozenshteina Str. – Molodyozhny Lane”.
  82. Work on development of detail design for reconstruction of electrochemical protection of gas pipelines in terms of relocation of protection units from under the construction site of the mast. Location: Saint-Petersburg, Novosyolki Village at Transformer substation No. 221.
  83. Work on design documentation for relocation of external networks of gas supply and heat supply at construction of road junction in Lyuban.
  84. Topographical survey of the land plot for reconstruction of fuel stations. Location:
    “Reconstruction of the fuel station, located at 134th km of Federal road M-10 “Skandinaviya”, on the right side, Leningrad Region”.
    “Reconstruction of the fuel station, located in Vyborg, Leningradskoye shosse, 79, Leningrad Region”.
    “Reconstruction of fuel station. Location: Pervomayskaya Volost, Ogonki Village, Federal road M-10 “Skandinaviya”, 65th km on the right side, Leningrad Region”.
    “Reconstruction of the fuel station, located in Vyborg, Brusnichnoye shosse, 12, Leningrad Region”.
    “Reconstruction of fuel station. Location: Kondratyevskaya Volost, Torfyanovka Village, Federal road M-10 “Skandinaviya”, 197th km, Leningrad Region”.
    “Reconstruction of the fuel station, located in Primorsk, Vyborgskoye shosse, 92, Leningrad Region”.
  85. Design documentation development. "Measures aimed at upgrading level of development of federal motorways. Construction of fixed weight-checking point at the 112+427 km of A-180 Narva-St. Petersburg Motorway – border with the Republic of Estonia, Leningrad Region.
  86. Delivery of design documentation for gas pipeline electrochemical protection installation for the facility. Location: St. Petersburg, Nevsky Administrative District, Prospect Obukhovskoy Oborony, Section 1 (across from House 144 A along Prospect Obukhovskoy Oborony).
  87. Works on installation of external heat supply network at the facility. Location: St. Petersburg, Fontanka River Emb (south-west of House 9 A along Klimov Lane).
  88. Development of working documentation for the project of heat supply network reconstruction in Quarter 1a (St. Petersburg, Quarter 1a of the "South-West" District, limited by: Morskoy Pekhoty St, Prospect Stachek, Prospect Marshala Kazakova, Prospect Marshala Zhukova), total length – 2.6 km.
  89. Development of design and working documentation for the Sports and Fitness Complex attached to State Educational Establishment Secondary General School No.305 in the Frunzensky District of St. Petersburg. Facility address: Budapeshtskaya St, Section 1 (south-east of the crossing with Fuchika Street).
  90. Development of design and estimate documentation for reconstruction of the water treatment system at the Vybogrskaya Heating Power Plant-17 of the OJSC TGK-1 Nevsky Branch.

Projects 2017

Projects 2016

The year 2016 was quite difficult as for design branch in Russia in general, and for our organization in particular. Because of the general reduction of amount of works on design we have concluded only 31 contracts which main share - state.
Because of bad investment climate and economic sanctions the share of contracts with the developer companies was extremely insignificant.
This fact, and also economic events in Russia, became a reason for acceptance by our company "strategy of reduction of expenses" for the purpose of preservation of the leading engineering staff of experts, and deduction of positions in the design market.

Projects 2015

Despite a difficult economic situation in the country, 2015 was quite successful for our company. 48 new contracts were signed, and the share of the state and municipal contracts became much more, than in previous years.
It is explained by the general economic recession in Russia as a result of which many investment projects were stopped while implementation of address programs went under the voted budget.
Road design, development of project and working documentation on construction of water-heating boiler rooms, and also liquidation of hazardous production facilities in the different cities of our country such as: St. Petersburg, Apatity, Ufa, Kazan, Yekaterinburg, Krasnoyarsk, Arkhangelsk etc., became the main direction, in design and exploration work of our company in 2015.

Projects 2014

To summarize 2014, we can say that the direction vector of our activities and assigned work priorities selected by the company in 2012 are completely justified. 61 agreements and state contracts were signed with contractors by the Engineering Infrastructure Design Institute. Among our new partners are such large organizations as OJSC ALROSA-Gaz and FSBI Petersburg Nuclear Physics Institute named after B. P. Konstantinov. Almost the third part of the signed agreements is state contracts. This is a measure of complex execution of works by the specialists of our Institute, our competitive power and confidence placed to us on the part of the state organizations and institutes. And numerous favourable conclusions of the expertise of design and estimate documentation are the evidence of our qualification.

Projects 2013

75 new projects of state and investment financing are the result of the activities of our company for 2013. 2013 shows that the decisions made by us in the previous years and analysis of the Institute development prospects are true. Following this policy, we obtained new possibilities on the market of the design works and showed ourselves to good advantage both among private customers and in the district authorities of the Leningrad and Moscow Regions.

Projects 2012

For the Design Institute, 2012 is the year of discovery and deployment of new trends – out company has been authorized for work package on engineering surveys (topographical, geological engineering, engineering-ecological surveys, etc.) and also our Institute has been awarded the certificates of conformity of the ISO 9001-2008 quality management at development of design documentation and survey works.
A separate group of specialists on road engineering has been formed, by virtue of which the solution on new construction and reconstruction of motor roads in St. Petersburg, Leningrad Region and Naro-Fominsk are implemented.
In 2012 the Engineering Infrastructure Design Institute concluded 90 investment contracts and state contracts and in this connection the works are performed.

Projects 2011

In 2011 our company implemented 60 large projects in different regions of Russia. Our main customers were legal entities and enterprises of JSC INTER RAO UES. New direction on survey, calculation and installation of hanger-support pipeline system was launched in the Design Institute.

Projects 2010

In the year 2010 the Engineering Infrastructure Design Institute has entered into and is performing works under 58 agreements and contracts. In most cases, the projects are owned by investment and developer companies. The Institute has also broadened the geography of its activities, working at facilities in Western Siberia.

Projects 2009

In the year 2009 the Institute specialists completed design works under 34 private commercial and federal contracts. Almost all design project documentation received the necessary approvals in expert and sanctioning organizations and was passed on to be applied for construction and installation works. Company employees built 3 heat power facilities completing full work cycle from design and survey works to commissioning.

Projects 2008

Within the period from June till December 2008 the company implemented 19 package design contracts.
Main assignment – design of linear facilities during modernization of motor roads, design of electrochemical protection installations for underground pipelines.