Projects for 2013 year – boiler plants, heat and gas supply networks, water supply

Brief projects outline
In the course of its activity the Institute has gained extensive design work experience in construction of engineering infrastructure networks and power facilities at a wide range of locations.
Design documentation developed by the specialists of the Engineering Infrastructure Design Institute became the basis for construction and reconstruction of many facilities in the Russian Federation among which motorways, mainline and distribution gas and oil pipelines in the Central, North-West, Southern, Volga regions; heating networks, communications and telephony, power networks as well as water supply and sewerage networks of Moscow, Saint-Petersburg and Leningrad's area.
Our company designing the systems of electrochemical protection of underground utilities has provided protection of many tens of kilometers of underground utilities.
On the basis of drawn-up and approved by industrial safety expert review documentation on liquidation and preservation of hazardous production facilities hundreds of technical devices were decommissioned and excluded from the register.

Company projects — 2013

projects
2008

projects
2009

projects
2010

projects
2011

projects
2012

projects
2014

  1. Development of the design and working documentation for the object: «HP external gas pipeline to the boiler of the industrial warehouse complex at the address: St. Petersburg, Shushary, Badaevskoe Department, Section No. 243».
  2. Development of the design and working documentation for reconstruction of electrochemical protection due to relocation of its units from under building footprint: «Internal Pipe Inspection Facility, Zelenogorsk, land plot 2, quarter 20».
  3. Development of the design documentation for the object: “Arrangement of fixed weight-checking point on the public motor road of regional significance “Mokhovoye – Kluychevoye” at the section of 8+000 km (Gavrilovo-1 Village) in the Vyborg District of the Leningrad Region”.
  4. Development of the design documentation for the object: “Arrangement of fixed weight-checking point on the public motor road of regional significance “Molodezhnoye –Verkhneye Cherkasovo” at the section of 58+800 km (Gavrilovo-2 Village) in the Vyborg District of the Leningrad Region”.
  5. Development of the design documentation for the object: “Arrangement of fixed weight-checking point on the public motor road of regional significance “Komsomolskoye – Priozersk” at the section of 61+500 km (Studenoye Lake) in the Vyborg District of the Leningrad Region”.
  6. Development of the design documentation for the object: “Arrangement of fixed weight-checking point on the public motor road of regional significance “Pargolovo – Ogonki” at the section of 33+500 km (Mednoye Lake) in the Vsevolozhsk District of the Leningrad Region”.
  7. Development of the design documentation for the object: “Arrangement of fixed weight-checking point on the public motor road of regional significance “Vyborg – Svetogorsk” at the section of 0+500 km (Petrovskoye Village) in the Vyborg District of the Leningrad Region”.
  8. Development of working project of modernization of stacks of the modular boiler at the Specialized Experimental and Production Facility of OJSC “SPMBM Malakhit” at the address: St. Petersburg, Moskovskoye shosse, 29/2.
  9. Development of the working documentation on reconstruction of commercial fiscal metering equipment in the boiler of SUE “Gorelektrotrans” of St. Petersburg at the address: St. Petersburg, Sredniy prospekt, 77
  10. Development of the design documentation section “Mechanical solutions of heat supply networks” for: “Reconstruction of main heating system 1250 rm long along Badaeva Str. from TK-9 at Voroshilova Str. to TK-43 along Iskrovsky pr. with entry to quarter 20 to the north of Novoselov Str. (СУН)”.
  11. Development and approval of the sections on TAC and electrochemical protection for: “Reconstruction of main heating system at the address: St. Petersburg, Parashyutnaya Str.”
  12. Development and approval of the sections on TAC and electrochemical protection for: “Reconstruction of main heating system at the address: St. Petersburg, Gakkelevskaya Str.”
  13. Development of the design and working documentation for GDP power supply for: “Construction of HP gas pipelines and GDP in the “Gorelovo” industrial area, St. Petersburg.
  14. Design of reconstruction heat supply networks of the “Severnaya” process area 3838 rm long: in quarter 30 Shuvalovo-Ozerki from bldg. 10/4 along Uchebny per. to CHS at the address: Lunacharskogo pr., 27/3; in quarter 31 Shuvalovo-Ozerki from Severny pr., 22 to Severny pr., 24/2; from TK-4 to Lunacharskogo pr., 37/2, 39/1, 2; in quarter 18 Shuvalovo-Ozerki from TK-2 to Ivana Fomina Str., 8 (ATS); in quarter 11 Shuvalovo-Ozerki from CHS at the address: Khoshimina Str., 11/5 to buildings: Khoshimina Str., 5/1, 7/1, 11/1, 11/2; Asafyeva Str., 6/2, 8, 10/1.
  15. Development of the design documentation on reconstruction of external heating networks 54450 rm long for: «Reconstruction of heating networks, St. Petersburg, quarter 26 Sosnovaya Polyana”.
  16. Development of documentation on preservation of internal gas pipeline for: “Central clinical military hospital of the Federal Security Service of the Russian Federation” at the address: Moscow, 1st Pekhotny per., 9/27.
  17. Works on development of the design documentation of reconstruction of industrial stack of the boiler in SABU “Trolley bus depot No. 1” of SUE “Gorelektrotrans” of St. Petersburg at the address St. Petersburg, Syzranskaya Str., 15.
  18. Development of the design documentation for: “Modular boiler for heat supply of block of flats at 3 Khlebnaya Str., 1 Energetikov Str., administrative building and hangar of machinery station No. 140 of the South-East track repair management of the structural subdivision of the central track repair management of the OSJC “RZhD” Yelets Branch.
  19. Development of the working documentation for external heat supply network for: “Construction of block of flats with built-in rooms and parking area, St. Petersburg, Marshala Blukhera pr., 8, letter Zh”.
  20. Engineering surveys and development of the design documentation for: “Process Area “Vostochnaya”. Design of reconstruction of heating and hot water supply pipelines: in quarter 3 of Rzhevka-Porokhovye from TK-3 to 6/1 Lenskaya Str.; in quarter 5 of Rzhevka-Porokhovye from 10 Lenskaya Str. to 14, 16/1 Lenskaya Str.; in quarter 4 Rzhevka-Porokhovye to: 32/1, 32/2, 34, 36 Kommuny Str., 49/1, 51/2, 51/3, 51/4, 53/3, 53/38 Entuziastov pr. Design of reconstruction heat supply network reconstruction: in quarter 38 of Bolshaya Okhta from 42/2 Sredneokhtinsky pr., to 5 Sinyavinskaya Str.; in quarter 33 of Bolshaya Okhta from 9 Krasnodonskaya Str. to: 29 B Bolsheokhtinsky pr., 8 Porokhovaya; from 40/13 Sredneokhtinsky pr. to: 34/12 B Sredneokhtinsky pr., 10 Porokhovaya” in 2013-2014 for the St. Petersburg state requirements.
  21. Development of the design and working documentation on preservation of the DHG equipment “Khimki-Khovrino» (3 boilers of PTVM-120E and facility mechanical annex) of Branch No. 2 «Severny» of OJSC «MOEK» at the address: Moscow, 38A Belomorskaya.
  22. Development of the working documentation of the air compressor room at the address: Leningrad Region., Lesogorsky Village and organization of Industry Safety Expertise of the documentation with its approval in the RF Rostekhnadzor.
  23. Construction design supervision of the motor road section at Krupskaya street from Kransoselskoye shosse to Leningradskoye shosse, required for approach to the Customer’s facility: “Multi-purpose shopping mall located to the address: Leningrad Region, Gatchina, Severnaya Vjezdnaya zone, at crossing of Leningradskoye and Krasnoselskoye Shosse, sections 2, 3”.
  24. State contract on development of the design and estimate documentation for construction of stage 1 of street and road network of 3.2 km long, at the address: Leningrad Region, Vsevolozhsk, Southern residential area, quarters 2, 3, 4, 5, 6, 7, 8.
  25. Environmental surveys for development of the design documentation for: “Local waste treatment plants” located at the address: Leningrad Region, Vsevolozhsky District, Kuzmolovsky urban settlement, 3 Zavodskaya Str.
  26. Front end engineering design on construction of utilities - external heating network, water supply and sewage networks (storm sewage and domestic), external gas supply, telephone network and power supply of the facility: “The territory limited by Kosaya line, 25th line of Vasilievky Ostrov, Maslyany canal, Kozhevennaya line, 26th line of Vasilievky Ostrov in the Vasilyostrovsky District of St. Petersburg”.
  27. Development of the technical documentation on hazardous production facilities liquidation (HPF) (process equipment, pipelines and building structures) at the facility of «PG Phosphorit” at the address: Leningrad Region., Kingisepp, Phosphorit Industrial Zone and organization of Industry Safety Expertise of the documentation with its approval in the RF Rostekhnadzor.
  28. Works on development of the design and working documentation of the central heating station (CHS) at the address: Saint-Petersburg, 18/2 A Laboratorny pr.
  29. Development of the documentation for liquidation of hazardous production facilities, that is the buildings of CJSC “Tyumen Plant of Plastic Materials” (Tyumensky Zavod Plastmass) at the address: Tyumen, 54 Pervomayskaya Str.
  30. Development of the documentation for liquidation of hazardous production facility, that is the gas boiler plant at the facility of CJSC “Football Club “Zenit” at the address: Saint-Petersburg, 76D Akkuratova Str.
  31. Development of the design documentation for construction of heating network of GUP “TEK SPb” from the boiler plant at 4A Kharchenko Str., room 1N and installation of the pump station in the boiler plant at 39/5 K Lesnoy pr., room 1N.
  32. Development of the working documentation by the sections:
    “Protection of HP and MP gas pipelines against electrochemical corrosion”,
    “Power supply of electrochemical protection of gas pipelines” as a part of the design documentation of HP gas supply pipeline, HP gas distribution point, MP submain gas pipelines for gas supply of 3 boiler plants (6к, 17к, 27к) of stage 1 of “Yuntolovo” residential estate construction at the address: St. Petersburg, 3rd Konnaya Lahta, Sections 2, 3, 4 (north-west of 45D 3rd Konnaya Lahta).
  33. Development of the technical documentation for liquidation of the hazardous production facility – fuel oil facility, JSC “Luga Abrasive Plant” at the address: Leningrad Region, Luga District, Luga, 32 Krasnoarmeyskaya Str.
  34. Development of the documentation for liquidation of the hazardous production facility – compressor station site, overhead crane area, aluminum foundry of JSC «Vyritsa experimental mechanical plant” at the address: Leningrad Region, Gatchina District, Vyritsa Village, 1 Pogranichnaya Str.
  35. Front end engineering design of the state contract for: “Construction of municipal arterial street at the section from Sukhodolskaya street to Medny Village in Ekaterinburg’.
  36. Works on development and approval of the design and working documentation of the main heating system of GUP “TEK SPb”:
    1. Reconstruction of main heating system from TK-1 at 6th Vyborgskaya boiler plant to: TK-2 in quarter 35, TK-1 in quarter 39: TK-7 at “Sputnik” hotel in quarter 17.
    2. Reconstruction of main heating systems at Akademika Baykova Str. from Svetlanovsky pr. To TK-11(17) in quarter 16а and in quarter 10 of Grazhdanka district from TK-4(12) to TK-5(13) at Grazhdansky pr.,
    3. Reconstruction of main heating systems in quarter 12 of Shuvalovo-Ozerki, from TK-29а at main heating system at Lunacharsky pr. to relay pump station in the quarter at the address: 5 Lunacharsky pr.
  37. Introduction of modifications in the working documentation of external heating networks using pipes CASAFLEX by SPb Renovatsiya, LLC, with area of 394 137 sq.m of the site development at the address: St. Petersburg, Krasnoselsky District, Territory of Quarter 7-17 Sosnovaya Polyana, between Veteranov pr., Pogranichnika Garkavogo Str., and Narodnogo Opolcheniya pr., Lyetchika Pilyutova Str.
  38. Development of the design documentation section “Reconstruction of utilities» (heat supply networks, external gas supply, telephone networks and cable power supply lines, external water supply and sewerage networks) for: “Design and construction of Turistskaya Str. from Shkolnaya Str. to Mebelnaya Str. With construction of a viaduct at crossing with railway line of Sestroretsk direction”.
  39. Development of the design and working documentation for reconstruction of electrochemical protection due to relocation of the gas pipeline from under building footprint: “Transposition of the MP gas pipeline section at the address: St. Petersburg, Central District, 37 A Dnepropetrovskaya Str.”
  40. Works on transposition of underground external gas supply networks at the address: St. Petersburg, Lazo Str., Section 1 (in front of 36 Irinovsky pr.).
  41. Design works on construction of industrial effluent treatment facilities for 3 boiler plants of GUP «TEK SPb» at the addresses: St. Petersburg, 17 Avangardnaya Str., 4 Krylenko Str., 6 Serebristy Blvd, with primary acquisition and procurement of the required approvals with authorized organizations and administration of the city.
  42. Development of the working documentation of electrochemical protection of steel case of offsite networks of water conduits and treated decontaminated effluents under the railway of the cottage village “Zolotye klyuchi” at the address: Leningrad Region, Gatchina District, near Nizhnyaya Village, section No. 3.
  43. Works on development of the design and working documentation of the external heat supply networks of the business center at the address: St. Petersburg, Leninsky pr., 160.
  44. Development of the working documentation on reconstruction of electrochemical protection of underground metal pipelines (MP gas pipeline DN 400 mm) at the address: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate.
  45. Development of the design and working documentation of the section: «External heat supply networks» from the boiler to the school (430 m long) for: “Construction of block of flats with integrated premises, boiler room and transformer substations at the address: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate”.
  46. Development of the working documentation on construction of the exit from the production site of CJSC «LSR-Basobye» at the address: 102 Oktyabrskaya Embankment, to nameless street with the further exit to Bolshevikov pr., St. Petersburg.
  47. Development of the working documentation on the individual heating plant with heating energy meter station and heating system for the “Komandarm” business center” at the address: St. Petersburg, 29 A Marshala Govorova Str.
  48. Works on design of the external heat supply network Pulkovo TPP from TK-16А to TK-16В with diameter 2DN200 at the address: Saint-Petersburg, 36 Pulkovskoye shosse, facility 1.
  49. Front end engineering design on electrochemical protection of gas pipelines for: “Reconstruction of gas pipelines of medium and low pressure at the address: St. Petersburg, quarter 24 M. Okhta (Novocherkassky Pr. – Tallinskaya Str. – Shaumyana Pr. – Zanevsky Pr.)”.
  50. Development of the documentation for liquidation of the hazardous production facility – alcohol cellar at the address: St. Petersburg, 24-a Moiseenko Str., as well as organization of industrial safety expert review of the design documentation with its approval in the RF Rostekhnadzor.
  51. Development of the design, working documentation on reconstruction of electrochemical protection of underground metal utilities at the following addresses in St. Petersburg: - Lakhta, main line 22 from main line 17 to 18, 5/1 Uakhtennaya Str. (Primorsky District);
    - 17 Fontanka River Emb. (Central District);
    - 10 Grechesky pr. (Central District);
    - 1 Smolenka River Emb. (Vasileostrovsky District);
    - 2 Udelny pr. (Vyborgsky District);
    - 16а Chapaeva Str. (Petrogradsky District);
    - 6 Podyezdnoy per. (Admiralteysky District).
  52. Development of the design and working documentation, “External heat supply networks” Section from the boiler to the school at the address: “Construction of block of flats with integrated premises, boiler room and transformer substations at the address: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate”.
  53. Development of the working documentation for relocation of gas pipeline electrochemical protection installations beyond the construction site of the metro shaft No. 572 at the address: St. Petersburg, Bolshoy pr. between 26th line and Klubny per.
  54. Works on preservation of the hazardous production facilities – casting complex site and fuel oil storage at the address: St. Petersburg, 11 Sedova Str.; industrial oil storage at the address: Saint-Petersburg, 18 Sverdlovskaya Emb.
  55. Development of the design and working documentation on design of the heat supply network sections from TK-10 to TK-13 and from TK-13 to TK-17 with diameter of 2DN700 at the address: Saint-Petersburg, 36 Pulkovskoye shosse, facility 1 (heat supply source is Pulkovo TPP).
  56. Development of the working documentation on reconstruction of the trolley line with relocation of the contact system supports for: “Residential building “House at Tukhachevskogo” at the address: Saint-Petersburg, 27/2 B Marshala Tukhachevskogo pr.
  57. Development of the working documentation on the electrochemical protection of the HP gas pipelines and GDP in the “Gorelovo” industrial area, St. Petersburg.
  58. Works on development of the design and working documentation for relocation of utilities (external gas supply network, power supply network, water supply and sewerage networks as well as external heat supply networks) from under the business center construction site at the address: Saint-Petersburg, 160 Leninsky pr.
  59. Development and approval of the working documentation to the volume required for construction of the road and exit from the Vaskelovo-Ogonki route from the check point 5 km+400 m to the Vorontsovskoe pit with total length of 2 km.
  60. Works on development of the documentation for liquidation of the hazardous production facility – ammonia cooling plant, OJSC “Luga canning factory” at the address: Leningrad Region, Luga, 18-A Leningradskoe shosse, as well as organization of industrial safety expert review of the documentation with its approval in the RF Rostekhnadzor.
  61. Survey works (geological engineering survey and ecological) and design works at construction of the motor road section at Krupskaya street from Kransoselskoye shosse to Leningradskoye shosse, required for approach to the Customer’s facility: Multi-purpose shopping mall located at the address: Leningrad Region, Gatchina, Severnaya Vjezdnaya zone, at crossing of Leningradskoye and Krasnoselskoye Shosse.
  62. Geological engineering and engineering ecological surveys at area of 12 ha for the “New Format-South” residential estate under construction: Leningrad Region, Tosnensky District, the northern end of Fedorovskoye Village.
  63. Development of the working documentation of reconstruction of electrochemical protection of steel gas pipeline at the address: St. Petersburg, 9 Professora Popova Str.
  64. Development of the design documentation “Construction and reconstruction of motor road М-5 «Ural» – from Moscow through Ryazan, Penza, Samara, Ufa to Chelyabinsk. Reconstruction of motor road М-5 «Ural» Moscow– Ryazan– Penza– Samara-Ufa– Chelyabinsk at sections 1231+400 km - 1243+700 km, 1243+400 km - 1256+700 km», the Orenburg Region.
  65. Liquidation of the capital structures of the industrial boiler complex of FSUE «NITI n.a. A.P. Aleksandrov» at the address: Leningrad Region, Sosnovy Bor, PO Box 22.
  66. Development of the working documentation for electrochemical protection of gas pipeline under relaying and steel case: «Approach road to the «Klimov» plant at the section from Parashyutnaya Str. to Zapovednaya Str.» in St. Petersburg.
  67. Works on relocation of gas pipeline electrochemical corrosion protection from under the sewerage network laying site at the address: St. Petersburg, Degtyarny per., section 1 (to the west of intersection with Novgorodskaya street), Capital construction of the First start-up facility (stage) of Administrative and Public Business Center with underground parking.
  68. Development of the design documentation for high pressure gas pipeline electrochemical protection: «Utilities and transport infrastructure in the production zone «Parnas», quarter 10 «А», St. Petersburg.
  69. Development of the documentation for liquidation of the hazardous production facilities – plant gas consumption system, compressor station site, car production area, mechanization area CJSC «VAGONMASH” at the address: St. Petersburg, 115 Moskovsky pr., along with industrial safety expert review of the design documentation with its approval in the North-West Department of the RF Rostekhnadzor.
  70. Correction of the design and working documentation for construction of the residential estate with boiler houses and transformer substations at the address: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate, building position 11 (LOT 11), construction stages I-II related to change of the boiler capacity.
  71. Works on correction of the working documentation for the external water supply and sewerage networks – apartment-type hostel at the address: St. Petersburg, Strelna Settlement, Teatral’naya Alley, 15
  72. Development of the design documentation for traffic organization from railway station Nara to Volodarskogo Str. in Naro-Fominsk, Moscow Region.
  73. Development of the working documentation for construction of the residential estate with boiler houses and transformer substations at the address: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate, building position 11 (LOT 11), construction stage III, sections: - External water supply and water disposal networks, foundation drainage;
    - Internal water supply and water disposal networks;
    - Heating. Ventilation. Smoke protection;
    - 2 pcs. DPH (domestic heating plant) with heating energy meter station;
    - External heating networks.
  74. Works on development of the design documentation of the “Corrosion protection” section of future external heat supply network with PU foam insulation with the ORC system at the address: St. Petersburg, to the south of the intersection of Bukharestskaya Str. and Dunaisky pr.
  75. Development of the design documentation for construction of the Residential estate with boiler houses and transformer substations at the address: Leningrad Region, Vsevolozhsky District, Kudrovo Village, Novy Okkervil Housing Estate, building position 11 (LOT 11), construction stage IV:
    External water supply and water disposal networks;
    Internal water supply and water disposal networks;
    Heating;
    Ventilation. Smoke protection;
    DPH (domestic heating plant) with heating energy meter station;
    Heating Networks;
    Foundation drainage;
    Measures on provision of compliance with the requirements of energy efficiency and requirements for equipping buildings and facilities with meters for measuring consumed energy resources;
    List of measures on environment protection:
    - period of construction and operation;
    - environment protection by physical factors. Provision of sound comfort in the residential estate rooms.

Projects 2017

Projects 2016

The year 2016 was quite difficult as for design branch in Russia in general, and for our organization in particular. Because of the general reduction of amount of works on design we have concluded only 31 contracts which main share - state.
Because of bad investment climate and economic sanctions the share of contracts with the developer companies was extremely insignificant.
This fact, and also economic events in Russia, became a reason for acceptance by our company "strategy of reduction of expenses" for the purpose of preservation of the leading engineering staff of experts, and deduction of positions in the design market.

Projects 2015

Despite a difficult economic situation in the country, 2015 was quite successful for our company. 48 new contracts were signed, and the share of the state and municipal contracts became much more, than in previous years.
It is explained by the general economic recession in Russia as a result of which many investment projects were stopped while implementation of address programs went under the voted budget.
Road design, development of project and working documentation on construction of water-heating boiler rooms, and also liquidation of hazardous production facilities in the different cities of our country such as: St. Petersburg, Apatity, Ufa, Kazan, Yekaterinburg, Krasnoyarsk, Arkhangelsk etc., became the main direction, in design and exploration work of our company in 2015.

Projects 2014

To summarize 2014, we can say that the direction vector of our activities and assigned work priorities selected by the company in 2012 are completely justified. 61 agreements and state contracts were signed with contractors by the Engineering Infrastructure Design Institute. Among our new partners are such large organizations as OJSC ALROSA-Gaz and FSBI Petersburg Nuclear Physics Institute named after B. P. Konstantinov. Almost the third part of the signed agreements is state contracts. This is a measure of complex execution of works by the specialists of our Institute, our competitive power and confidence placed to us on the part of the state organizations and institutes. And numerous favourable conclusions of the expertise of design and estimate documentation are the evidence of our qualification.

Projects 2013

75 new projects of state and investment financing are the result of the activities of our company for 2013. 2013 shows that the decisions made by us in the previous years and analysis of the Institute development prospects are true. Following this policy, we obtained new possibilities on the market of the design works and showed ourselves to good advantage both among private customers and in the district authorities of the Leningrad and Moscow Regions.

Projects 2012

For the Design Institute, 2012 is the year of discovery and deployment of new trends – out company has been authorized for work package on engineering surveys (topographical, geological engineering, engineering-ecological surveys, etc.) and also our Institute has been awarded the certificates of conformity of the ISO 9001-2008 quality management at development of design documentation and survey works.
A separate group of specialists on road engineering has been formed, by virtue of which the solution on new construction and reconstruction of motor roads in St. Petersburg, Leningrad Region and Naro-Fominsk are implemented.
In 2012 the Engineering Infrastructure Design Institute concluded 90 investment contracts and state contracts and in this connection the works are performed.

Projects 2011

In 2011 our company implemented 60 large projects in different regions of Russia. Our main customers were legal entities and enterprises of JSC INTER RAO UES. New direction on survey, calculation and installation of hanger-support pipeline system was launched in the Design Institute.

Projects 2010

In the year 2010 the Engineering Infrastructure Design Institute has entered into and is performing works under 58 agreements and contracts. In most cases, the projects are owned by investment and developer companies. The Institute has also broadened the geography of its activities, working at facilities in Western Siberia.

Projects 2009

In the year 2009 the Institute specialists completed design works under 34 private commercial and federal contracts. Almost all design project documentation received the necessary approvals in expert and sanctioning organizations and was passed on to be applied for construction and installation works. Company employees built 3 heat power facilities completing full work cycle from design and survey works to commissioning.

Projects 2008

Within the period from June till December 2008 the company implemented 19 package design contracts.
Main assignment – design of linear facilities during modernization of motor roads, design of electrochemical protection installations for underground pipelines.