Projects for 2014 year – boiler plants, heat and gas supply networks, water supply

Brief projects outline
In the course of its activity the Institute has gained extensive design work experience in construction of engineering infrastructure networks and power facilities at a wide range of locations.
Design documentation developed by the specialists of the Engineering Infrastructure Design Institute became the basis for construction and reconstruction of many facilities in the Russian Federation among which motorways, mainline and distribution gas and oil pipelines in the Central, North-West, Southern, Volga regions; heating networks, communications and telephony, power networks as well as water supply and sewerage networks of Moscow, Saint-Petersburg and Leningrad's area.
Our company designing the systems of electrochemical protection of underground utilities has provided protection of many tens of kilometers of underground utilities.
On the basis of drawn-up and approved by industrial safety expert review documentation on liquidation and preservation of hazardous production facilities hundreds of technical devices were decommissioned and excluded from the register.

Company projects — 2014

projects
2008

projects
2009

projects
2010

projects
2011

projects
2012

projects
2013

projects
2015

  1. Design works on the projects located in the territory of the residential area “Dubovaya Roscha”, zone “А” in municipal district Kotelnikovsky of the Volgograd Region (396 houses) – section “External gas supply” (length of gas supply networks is 10.7 km), as well as coordination of technical documentation by the state expertise authorities.
  2. Development of the working documentation of the electrochemical protection section for the underground steel structures of the facility: “Warehouse for agricultural products in Saint-Petersburg, Krasnoselsky District, Territory of “Predportovy” enterprise, land plot 137, 138”.
  3. Field supervision of construction of 11.2 MW automatic detached gas water boiler located at the address: Leningrad Region, Anninskoye village municipal formation.
  4. Field supervision works of construction of the alumina shop digestion site steam pipeline of 412 rm long of the CJSC “BaselCement-Pikalyovo”.
  5. Implementation of the state contract of engineering surveys and development of the design and working documentation for the project: “Reconstruction of motor road “Approach to Gatchina town” in the Gatchina District of the Leningrad Region.
  6. Development of design and estimate documentation for improvement of the “Bed of honour” memorial on Rumbolovskaya Mount in Vsevolozhsk of the Leningrad Region.
  7. Development of the design documentation for liquidation of the hazardous facility “Hazardous substances transportation site”, (railway loading rack) for the project: FSBI Petersburg Nuclear Physics Institute named after B. P. Konstantinov.
  8. Development of the design and working documentation of the approach lines, petrochemicals loading rack and loading platform for the project: “Reconstruction of the facilities of the fuels and lubricants base of the Pacific Fleet and port terminal No. 61”, the Goldobin Cape, Vladivostok, the Primorie Territory, military camp No. 13.
  9. Development of the working documentation of the electrochemical protection of the underground steel structures of the facility “HP gas pipeline and steel case” for the project: “Leningrad Region, Lomonosovsky District, “Anninskoye village” municipal formation, OJSC “SevNIIGiM” near Novoseliye village”.
  10. Development of the hazardous facility liquidation project “Hazardous substances transportation site”, operated by OJSС “RUSAL Boksitogorsk” located at the address: Leningrad Region, Boksitogorsk, 1 Zavodskaya Str.
  11. Engineering surveys as well as development of the design and working documentation for the project: “Construction of continuation of Slepnev street (from Aviatrissa Zvereva street to connection to Kievskaya street)” in Gatchina, the Leningrad Region.
  12. Development of the design documentation section “List of environmental measures” for the project: “Five-storey bearing-wall house at the address: 2 Tolmachyov lane, in Tolmachyovo urban settlement of the Luzhsky District of the Leningrad Region”.
  13. Development of technical documentation for liquidation of hazardous facility: “Central processing facility, (UKPG-1), Mirny, the Republic of Sakha (Yakutia)” and industrial safety expert review of the technical documentation and its registration in Rostekhnadzor.
  14. Development of the technical documentation for liquidation of the hazardous facility – gas consumption system, CJSC “St. Petersburg tractor plant” at the address: Saint Petersburg, 47 Stachek pr.
  15. Development of the technical documentation for liquidation of hazardous facility – steam boiler ДКВр-6,5/13 (renovated water-tube two-drum boiler) at the facility of FSUE “Synthetic rubber scientific research institute” at the address: Saint Petersburg, 1 Gapsalskaya Str.
  16. Works on development and agreement of the project for traffic organization together with organization of parking spaces at the section of street and road network of Saint Petersburg, limited by the following main roads and streets: Liteiny pr., Kirochnaya str., Ligovsky pr., Nevsky pr. in 2014 for the public use of Saint Petersburg.
  17. Engineering and environmental survey for construction of houses in Tolmachyovo village, the Luzhsky District of the Leningrad Region.
  18. Development of the design and working documentation of construction of 11.2 MW automatic detached gas water boiler located at the address: Leningrad Region, Anninskoye village municipal formation.
  19. Development of the design documentation on bank side protection for the project: “Passway in the north part of the residential quarter at the address: Leningrad Region, Vsevolozhsky District, Koltyshskoye rural settlement, Aro village”.
  20. Development of pre-design architectural solutions and project of improvement of the bed of honour territory of WWII in Vsevolozhsk, Leningrad Region..
  21. Implementation of the state contract on development of the technical documentation for the project: “Liquidation of boiler No. 13, Gogol str., Kirov, Kaluga Region”.
  22. Development of the design and working documentation of the “Pipeline electrochemical protection” section for the project: “Reconstruction and development of the small ring of the Moscow railways. Organization of passenger railway traffic” as per the title: “Reconstruction of the Andronovka (incl.) – Kanatchikovo (excl.) section. Stage 4.”
  23. Development of the design documentation section “List of environmental measures” for the project: “Reconstruction of the warehouse building with the administration and amenity addition at the address: Saint-Petersburg, 24/6 V the Road to Turukhtannye ostrova”.
  24. Implementation of the state contract on development of the working documentation section “System of control and safety automatic devices of gas boilers” in the boiler house of the facility: “Vintage car museum” at the address: Moscow, 9/2 Rogozhsky Val str.
  25. Development of the design and working documentation for technical upgrade of the gas pipeline electrochemical corrosion protection installations of “PeterburgGaz” Ltd. for 2014 in accordance with the Address program (15 addresses):
    Chugunnaya str. T/S (36 Chugunnaya str. (transformer substation)
    38/93 Karpinsky str., Severny pr. (93 Severny pr.)
    40/3 Novoizmailovsky pr.
    6 Chernyshevsky sq.
    17/38 Kupchinskaya str.
    Pushkin, 52-54 Revolutsii str. (52-54 Malaya)
    35/3 Nalochnaya str.
    31/15 L.Tolstoy str.
    96 Veteranov pr.
    5/3 Soldier Korzun str.
    6 Rashetov str.
    16/1 Smolyachkov str.
    147 Obukhovskoy Oborony pr. (3 Zheleznodorozhny pr.)
    163 Obukhovskoy Oborony pr.
    25 Peredovikov str. Vostochnaya MDS (MDS “Vostochnaya”)
  26. Development of the design and working documentation on reconstruction of electrochemical protection installations of underground metal utilities of OJSC “Antikor” at the following addresses in St. Petersburg:
    1. 180 Veteranov pr.
    2. 82 Bolshoy pr. of the Vasilievsky Ostrov
    3. 100 Voskovsky pr.
    4. 2 Avtovskaya str.
    5. 118, Obvodny kanal emb. (near Varshavsky railway station)
    6. 42 Borovaya str.
    7. 13 Chernigovskaya str.
  27. Development of design documentation of electrochemical protection of underground steel pile planking of the two-storey underground parking of the facility: “Multi-purpose complex with built-in rooms and underground parking lot” at the address: St. Petersburg, 24 A Bolshaya Zelenina.
  28. Development of technical documentation for liquidation of 2 boilers ДКВР-4/13 at the facility at the address: St. Petersburg, 54 L Bestuzhevskaya str.
  29. Construction design supervision of the motor road section at Krupskaya street from Kransoselskoye shosse to Leningradskoye shosse, required for approach to the Customer’s facility: “Multi-purpose shopping mall located to the address: Leningrad Region, Gatchina, Severnaya Vjezdnaya zone, at crossing of Leningradskoye and Krasnoselskoye Shosse, sections 2, 3”.
  30. Development of the design documentation of the sections “Internal gas supply” and “Automation of internal gas supply, including gas metering unit” of the gas water boiler house at the address: St. Petersburg, 35 M Olga Berggolts str.
  31. Development of the design documentation for relocation of gas pipeline electrochemical corrosion protection installation from under future construction site at the facility at the address: St. Petersburg, 29 A Morskoy pr.
  32. Development of the design and working documentation of external heat supply networks construction of the facility of CJSC “ADAMANT” at the address: St. Petersburg, 72 A Moika River emb.
  33. Reconstruction of the treatment facilities of the storm sewage system with capacity of at least 5000 m3/h, located in the Yuzhny microdistrict, Vsevolozhsk.
  34. Implementation of the state contract on development of the design and estimate documentation for arrangement of the passageway with traffic management along Zavodskaya str. (from Leningradskaya str. to Mezhevaya str.), along Mezhevaya str. and Vokka str. in Vsevolozhsk of the Leningrad Region.
  35. Development of the working documentation of the electrochemical protection for the steel cases of the project: “The utility networks route for the facilities located at the following: Leningrad Region, Vsevolozhsky District, the land of Agricultural Joint-Stock Company “Ruchji”, Murino Village.
  36. Development of the technical documentation for liquidation of the hazardous facility – gas consumption system of the state research institute “All-Russian research institute for fats, RAS” located at the address: St. Petersburg, 10 Chernyakhovsky str., as well as organization of industrial safety expert review of the technical documentation and its registration in the RF Rostekhnadzor.
  37. Development of the design and working documentation: “15.6 MW boiler house for heat supply of the buildings and facilities within the design territory (12.6 ha)”, “Central heating stations of container type (3 pcs.), maintenance of the building and facility” of the project: “Construction of complex residential construction of 12.6 ha” at the address: Moscow Region, Khimki, Podrezkovo microdistrict within the section of Gornaya street and Skhodnya microdistrict boundaries – residential construction territory along Mira street”.
  38. Development of the technical documentation for liquidation of the hazardous facility – the boiler house of OJSC “Almetyevsk Pipe Plant”, industrial safety expert review of the documentation and registration of the conclusion in the Rostekhnadzor for the project: Republic of Tatarstan, Almetyevsk , 35 Industrialnaya str.
  39. Development of the design documentation for 3 domestic heating plants of the project: “Apartment residential building with built-in rooms at the address: St. Petersburg, Ryabovskoye shosse, Section 1 (to the south 101 A Ryabovskoye shosse)”.
  40. Development of the design documentation of the utilities of gas supply, water supply and sewerage, communication networks, electric feeding networks, built-in transformer substation, roof gas water boiler of the business center at the address: St. Petersburg, 9 Sytninskaya str.
  41. Development of the working documentation for rearrangement of the outdoor lighting network (temporary version) due to reconstruction of the building at the address: St. Petersburg, 2 V Yevstegneevskaya str., as well as organization of approval of this section in St. Petersburg SUE “Lensvet”.
  42. Design of approach roads and development of the scheme of traffic to the shopping mall at Proletarskaya str. in Proletarsky district of Tula.
  43. Design of approach roads and development of the scheme of traffic to the shopping mall in Syktyvkar, 141 Oktyabrsky prospekt.
  44. Correction of the working documentation of the section “Domestic heating plant” of the facility at the address: Saint-Petersburg, Fontanka River Emb., Section 1 (to the south-west of 9 А along Klimov Lane).
  45. Development of the design and working documentation for electric power supply of the packaged gas distribution point for the project: “Installation of gas service in Zelenogorsk. Stage VI. Design and construction of GDP with complex of feeding gas pipelines of high and medium pressure, connection with the existing gas pipelines along Dlinnaya and Vostochnaya streets”.
  46. Development of the technical documentation for liquidation of fuel oil facility of the boiler house located at the address: Leningrad Region, Tosnensky District, Ryabovo urban settlement, 3 Dorozhnaya str.
  47. Development of the documentation for preservation of the gas burner of the melting furnace at the casting shop of SUE “St. Petersburg Underground” Joint workshops (OMch) at the address: Saint-Petersburg, 4 3rd Rybatsky proezd.
  48. Development and approval of the design and working documentation for phase-by-phase rearrangement of trolley bus overhead system on Kantemirovskaya street, St. Petersburg as per temporary and constant version.
  49. Works on correction (division into two sections) of the design documentation for the project “Reconstruction of the section of heating main No. 2 2DN 630 mm along Shirotnaya str. from NO7 to 9P4 with PU foam insulation with the ORC system with increase of diameter by 2DN 800" of 335 m long for the Tyumen heat networks branch office of OJSC “Ural heat network company”.
  50. Development of the documentation for liquidation of the hazardous production facilities of OJSC “NPP “Krasnoznamenets” – Boiler house; Special article production site; Fuel oil storage site; Zarechnaya production site at the address: St. Petersburg, 44/2 Kapsyulnoye shosse.
  51. Implementation of the state contract on development of the design and working documentation for the project: “Design of reconstruction of external heat supply networks of SUE “TEK SPb” of 8937 m long of the industrial area “”Yuzhnaya” in the Moskovsky and Kirovsky dostrict of St. Petersburg.
  52. Development of the design documentation of the road network of 8000 m long of the cottage village near the Pavlovo urban settlement of the Leningrad region.
  53. Development of the design and working documentation for relocation of utilities from under the construction site as well as design of water supply and water disposal networks, heat supply networks of the project: “Apartment residential building with integrated-attached parking lot at the address: St. Petersburg, Nevsky District, 6/4 B Chudnovsky str.
  54. Development of the working documentation for electrochemical protection of sectional steel case of DN 720 mm, located along Sofiyskaya str. within the “Production area “Izhora plants” in St. Petersburg.
  55. Development of the working documentation for reconstruction of the utilities of the water supply and sewerage systems, plot plan as well as in-site road of the facility in the Moscow region, Domodedovo: “Expansion of the Domodedovo air-terminal complex building”. Passenger terminal Т-1”.
  56. Development of the working documentation for external heat supply networks for the facility at the address: St. Petersburg, Kosygin pr., Section 1 (between houses Nos. 27 and 33).
  57. Works on development of the technical documentation for liquidation of the hazardous production facility (ammonia cooling plant) of OJSC “Oil and fat plant of St. Petersburg” at the address: St. Petersburg, 8 Maslyany lane, with organization of industrial safety expert review of the design documentation and registration of the conclusion in the RF Rostekhnadzor North-West Directorate.
  58. Design works for the project: “Reconstruction of the boiler house of the “Detsky plant” located at the address: Tula Region, Leninsky settlement, 28 Mekhanizatorov str., taking into account liquidation of the boiler house of CJSC “Leninsky”, located in Leninsky settlement, 18a Mekhanizatorov str. and reconstruction of heat supply networks (Leninsky workers settlement)”
  59. Participation in the tender for development of the best architectural concept of arrangement and development of the Oka River embankment in Kaluga in 2014.
  60. Development of the design documentation for 3 domestic heating plants of the project: “Apartment residential building with built-in rooms at the address: St. Petersburg, Kovalyovskaya street, section 1, (territory limited by Ryabovskoye shosse, right of way of the Oktyabrskaya Railways, projected passage, Kamyshinskaya str., Belomorskaya str.; workschool No. 4)”.
  61. Development of the pre-design documentation for roundabout traffic scheme in Naro-Fominsk, Moscow Region at crossing of Moskovskaya str. and Pogodin str. and at crossing of Tunekny proezd str. and Poluboyarov str.

Projects 2017

Projects 2016

The year 2016 was quite difficult as for design branch in Russia in general, and for our organization in particular. Because of the general reduction of amount of works on design we have concluded only 31 contracts which main share - state.
Because of bad investment climate and economic sanctions the share of contracts with the developer companies was extremely insignificant.
This fact, and also economic events in Russia, became a reason for acceptance by our company "strategy of reduction of expenses" for the purpose of preservation of the leading engineering staff of experts, and deduction of positions in the design market.

Projects 2015

Despite a difficult economic situation in the country, 2015 was quite successful for our company. 48 new contracts were signed, and the share of the state and municipal contracts became much more, than in previous years.
It is explained by the general economic recession in Russia as a result of which many investment projects were stopped while implementation of address programs went under the voted budget.
Road design, development of project and working documentation on construction of water-heating boiler rooms, and also liquidation of hazardous production facilities in the different cities of our country such as: St. Petersburg, Apatity, Ufa, Kazan, Yekaterinburg, Krasnoyarsk, Arkhangelsk etc., became the main direction, in design and exploration work of our company in 2015.

Projects 2014

To summarize 2014, we can say that the direction vector of our activities and assigned work priorities selected by the company in 2012 are completely justified. 61 agreements and state contracts were signed with contractors by the Engineering Infrastructure Design Institute. Among our new partners are such large organizations as OJSC ALROSA-Gaz and FSBI Petersburg Nuclear Physics Institute named after B. P. Konstantinov. Almost the third part of the signed agreements is state contracts. This is a measure of complex execution of works by the specialists of our Institute, our competitive power and confidence placed to us on the part of the state organizations and institutes. And numerous favourable conclusions of the expertise of design and estimate documentation are the evidence of our qualification.

Projects 2013

75 new projects of state and investment financing are the result of the activities of our company for 2013. 2013 shows that the decisions made by us in the previous years and analysis of the Institute development prospects are true. Following this policy, we obtained new possibilities on the market of the design works and showed ourselves to good advantage both among private customers and in the district authorities of the Leningrad and Moscow Regions.

Projects 2012

For the Design Institute, 2012 is the year of discovery and deployment of new trends – out company has been authorized for work package on engineering surveys (topographical, geological engineering, engineering-ecological surveys, etc.) and also our Institute has been awarded the certificates of conformity of the ISO 9001-2008 quality management at development of design documentation and survey works.
A separate group of specialists on road engineering has been formed, by virtue of which the solution on new construction and reconstruction of motor roads in St. Petersburg, Leningrad Region and Naro-Fominsk are implemented.
In 2012 the Engineering Infrastructure Design Institute concluded 90 investment contracts and state contracts and in this connection the works are performed.

Projects 2011

In 2011 our company implemented 60 large projects in different regions of Russia. Our main customers were legal entities and enterprises of JSC INTER RAO UES. New direction on survey, calculation and installation of hanger-support pipeline system was launched in the Design Institute.

Projects 2010

In the year 2010 the Engineering Infrastructure Design Institute has entered into and is performing works under 58 agreements and contracts. In most cases, the projects are owned by investment and developer companies. The Institute has also broadened the geography of its activities, working at facilities in Western Siberia.

Projects 2009

In the year 2009 the Institute specialists completed design works under 34 private commercial and federal contracts. Almost all design project documentation received the necessary approvals in expert and sanctioning organizations and was passed on to be applied for construction and installation works. Company employees built 3 heat power facilities completing full work cycle from design and survey works to commissioning.

Projects 2008

Within the period from June till December 2008 the company implemented 19 package design contracts.
Main assignment – design of linear facilities during modernization of motor roads, design of electrochemical protection installations for underground pipelines.