Projects for 2015 year – boiler plants, heat and gas supply networks, water supply

Brief projects outline
In the course of its activity the Institute has gained extensive design work experience in construction of engineering infrastructure networks and power facilities at a wide range of locations.
Design documentation developed by the specialists of the Engineering Infrastructure Design Institute became the basis for construction and reconstruction of many facilities in the Russian Federation among which motorways, mainline and distribution gas and oil pipelines in the Central, North-West, Southern, Volga regions; heating networks, communications and telephony, power networks as well as water supply and sewerage networks of Moscow, Saint-Petersburg and Leningrad's area.
Our company designing the systems of electrochemical protection of underground utilities has provided protection of many tens of kilometers of underground utilities.
On the basis of drawn-up and approved by industrial safety expert review documentation on liquidation and preservation of hazardous production facilities hundreds of technical devices were decommissioned and excluded from the register.

Company projects — 2015

projects
2008

projects
2009

projects
2010

projects
2011

projects
2012

projects
2013

projects
2014

projects
2016

  1. Development of design and estimate documentation for the 2nd stage of construction of the street and infrastructure in the housing estate zone II of the public center of Obninsk, region of TsNT and EOU "Eureka".
  2. Implementation of works on development of documentation on liquidation of dangerous productive objects of PAO ANK Bashneft Bashneft-UNPZ" on a title: "Liquidation of inactive constructions and networks with the transfer of operating networks and engineering preparation of territory of setting of the slow coking (UZK-2000).
  3. Development of project and working documentation "Protection against Electrochemical Corrosion" (including carrying out of parts of installation of protection against electrochemical corrosion), within the project of facilities and infrastructure design development of an object in St. Petersburg the territory, limited Botanicheskaya St., Ulyanovskaya St., Astronomicheskaya St., Gostilitskoye Highway, Prigorodnaya St. with road infrastructure and engineering transport service".
  4. Design of documentation on liquidation of hazardous production facility of JSC Apatit – "The 250 Gcal boiler room and black oil storage of city f Kirovsk", with the organization of examination of industrial safety for documentation and registration in Rostekhnadzor of the Russian Federation.
  5. Design of project and working documentation for construction of the highway 400 m long between Pushkinskoye Highway and Chekhov st. for needs of the Residential Complex "IQ Gatchina" located in Gatchina, quarter 1.
  6. Performance of engineering researches and design of engineering and transport infrastructure (highways, gas pipeline, water supply and sewerage, power supply, external lighting, heat supply) of the district Zayachiy remiz, quarter No. 10 Gatchina.
  7. Design of project and working documentation on joining of passageway with transfer of public transport stop and reconstruction of the existing road: The highway code 4260345 "Naro-Fominsk, Ploshad svobodu St." of the III technical category 0+200 to the right (the existing road), km 0+400 ( passageway).
  8. Implementation of the municipal contract for carrying out design and survey works, and also development of the design and estimate documentation on improvement of a drainage system from territories of the Tosnensky city settlement, Leningrad region.
  9. Performance of design and exploration work on objects: "Construction of 5 block and modular boiler rooms located in the territory of the Kolomna municipal district, Moscow region". Arrangement of boiler rooms: settlement Vozrozhdeniye, village Pirochi, village Selnikovo, settlement Pervomayskiy, village Octyabrskoye.
  10. Development of documentation on liquidation of hazardous production facility of JSC Mashinostroyeniye Severnaya Verf – the shop No. 5, the site of hot galvanizing located at St. Petersburg, Korabelnaya St., 6.
  11. Development of working documentation on construction of the sewer pump station (SPS) as a part of the project: "The Child Care Educational Institution (CCEI) on 80 places" located in St. Petersburg, Lazo St., 1 (opposite to the house 36, lit. A on Irinovsky Avenue).
  12. Development of documentation on liquidation of hazardous production the silo-type storage for state unitary enterprise Food Fund located in St. Petersburg, Obukhovskoy Oborony Ave., 7, Lit.P.
  13. Development and expertize of industrial safety for documentation on liquidation of hazardous production facility "Platform of storage of the black oil fuel of regional treatment facilities" located at Naberezhnye Chelny, Shlyuzovaya St., 112 .
  14. Development and expertize of industrial safety for documentation on liquidation of hazardous production facility "Platform of storage of the black oil fuel of regional treatment facilities" located at Naberezhnye Chelny, Shlyuzovaya St., 112 .
  15. Development of documentation on preservation with the subsequent elimination of the equipment used on hazardous production facility of CJSC Ural Pipe Plant located at Yekaterinburg, st. Frontovux brigad, 18.
  16. Performance of engineering researches and project documentation (implementation of the municipal contract) on construction of engineering networks of water supply and water disposal for the Sports and improving complex in Leningrad Region, Gatchina, Vyritsa, Moskovskaya St., 55.
  17. Implementation of the Municipal contract works on design of road and transport infrastructure 5 km long and system of power supply of sites for private individual construction (59 sites) in the territory of 18,5 hectares, village Shaglino, Gatchina district, Leningrad region.
  18. Аdjustment of the "Design of construction a Gas Block and Modular Boiler with power of 3 MW of Objects of the Social Sphere of Regional Property" located in Leningrad region, Gatchina district, Vyritsa, GOY DOD DOOTS Mayak Public Educational Institution.
  19. Implementation of architectural supervision of construction of the facility: "The access road to gas station in the territory of the state natural complex wildlife area «Shalovo-Perechitsky» of regional value in Leningrad region, Luga municipal district, Tolmachyovsky city settlement, near the village New Kupely".
  20. Development of working documentation of the highway and schemes of the organization of traffic (the circular motion) on Volodarskogo St. (around McDonald's restaurant) in Naro-Fominsk, Moscow region.
  21. Development of documentation on liquidation of hazardous production facility - gas station No. 300 (AGZS) "Okruzhnoye shosse-2" located in Arkhangelsk region, Arkhangelsk, Okruzhnoye Highway, 2, with the organization of examination of industrial safety of documentation and registration in Rostekhnadzor of the Russian Federation.
  22. Development of technical documentation on repair of pipelines of transportation of steam (Р =39 atm., T=440 C) and reducing-cooling installations of the shop of nitric acid on the territory of JSC Acron, Veliky Novgorod.
  23. Development of project and working documentation of water and peat decrease for an object the northwest nanotechnological center. "Engineering preparation of the territory” (1-12 stages of construction) to the address: Leningrad region, Gatchina municipal district, Pushkinskoye Highway, 20.
  24. Development of the project on modernization of internal lighting system at WRIGLEY LLC, St. Petersburg, Pulkovskoye Highway, 48.
  25. Development of project and working documentation according to the municipal contract on an object: "The platform for a stop of tourist buses and the individual transport at the territory of the state memorial estate «The Gatchina» and reconstruction of Kirasirsky proezd with the subsequent passing of state examination.
  26. Implementation of project works on connection of the block and complete power station (BCPS) with the electrochemical generator to networks of gas supply of high pressure of GRS "Northwest combined heat and power plant" in St. Petersburg, settlement Olgino.
  27. Development of sections of project and working documentation for construction of a boiler room and engineering networks of an object located in St. Petersburg, Petrodvorets, Sankt-Peterburgsky Ave., 60, lit. A.
  28. Development of project of liquidation of hazardous production facilities – 11 gas boiler rooms of GUP TEK SPb: "Updating of project and working documentation on reconstruction and construction of system of heat supply of the area Malaya Okhta" with passing of examination of industrial safety and registration in Rostekhnadzor of the Russian Federation.
  29. Support in non-state examination expertise of the project documentation "The access road to gas station in the territory of the state natural complex wildlife area Shalovo-Perechitsky of regional value", situated in Leningrad region, Luga municipal district, Tolmachyovsky city settlement, near Novye Kupely.
  30. Implementation of project works on preservation of hazardous production facility of the Peterburgteploenergo Ltd. – project: "Installation reservoir the liquefied gas", Leningrad Region, Vyborgsky district, settlement Zerkalnuy, with the subsequent organization of expertize of industrial safety for technical documentation and its registration in Rostekhnadzor of the Russian Federation.
  31. Implementation of work on development and coordination of working documentation of the polyethylene external gas pipeline to a boiler room of the production and warehouse complex located in St. Petersburg, settlement Shushary, Badayevskoye.
  32. Implementation of project works on reconstruction of the water-heating gas boiler room of the 3,57 MW for the Voentorg Zapad Ltd. located in Moscow Region, Podolsk.
  33. Development of predesign decisions on improvement of the territory of an object in Leningrad region, Vsevolozhsk, territory limited by Nagornaya Street, Dorozhnaya Street and highway A-128 "Road of Life".
  34. Works on project and working documentation for construction of the highway in the extent of 600 m for needs of the housing estate "IQ Gatchina" located at the address: Gatchina, entrance, block 1.
  35. Development of documentation on liquidation of hazardous production facilities of The Apatit Ltd.– projects: "A boiler room and black oil economy of the Central mine" and "A boiler room and black oil economy of East mine", with the organization of examination of industrial safety for documentation and registration in Rostekhnadzor of the Russian Federation.
  36. Development of the list of actions for environmental protection and performance of engineering-ecological researches for the object located in St. Petersburg, Mayakovsky St., 15, lit. A.
  37. Development of the design and estimate documentation for 2 objects: "Kolskaya GMK" Ltd. The shop power - and power supply. Electroboiler rooms for GVU-4 and GVU-7 of the Northern mine of the Kaula-Kotselvaaara mine. Transfer of the building built over the mine to electric heat supply (Elimination of a black oil boiler room)".
  38. Development of the project of preservation of hazardous production facility - installation on production, storage and regasification of liquefied natural gas of an object of LLC Gazenergoset St. Petersburg in Vyborg.
  39. Performance of a complex of works on engineering-geological researches, and also development of the project documentation on an object: "Design of the highway on Industrialnaya St. in Gatchina, Leningrad Region".
  40. Works on implementation of the design and estimate documentation on elimination of productions of peroxide of methylethylketone, a tretbutilperbenzoat, sulfate of magnesium, warehouse economy as a part of pump office with the external capacitor park and a railway enclosure with a loading/unloading stand platform in the shop No. 1 of the OP and TG plant of Kazanorgsintez Ltd, with passing of examination of industrial safety and registration of the judgment of industrial safety in the Privolzkiy Rostekhnadzor of the Russian Federation.
  41. Liquidation of hazardous production facility of the «Central Design Bureau of an Apparatostroyeniye» LTD located in Tula, Demonstratsii St., 36, and also the organization of expertize of industrial safety of the project documentation and its registration in Rostekhnadzor.
  42. Development of technical documentation on recultivation of the solid waste landfill (SW) located in Dolgoprudny, Moscow region.
  43. Development of the project documentation on liquidation of hazardous production facilities: gas pipelines and the gas equipment of two coppers E-1\9G in the boiler room No. 4 located in Moscow Region, Balashikha, and Dzerzhinsky’s district.
  44. Implementation of engineering-geological researches and development of the project documentation of the highway DNP in the territory with a total area of 39 Hectares, located in Leningrad Region, Gatchina district, near Gorky's village, the field No. 84.
  45. Development of working documentation on modernization of ways of evacuation (highway) from the building No. 380 to Highway No. 2 Leningrad nuclear power plant (NPP), located in Leningrad Region, Sosnovy Bor.
  46. Works on development of working documentation of construction of the sewer pump station (SPS) for needs of the housing estate "IQ Gatchina" in Gatchina, Leningrad Region.
  47. Development of the project of liquidation of hazardous production facility (The shop on production of flour No. 2 (grain mill) located in: Novorossiysk, Elevatornaya St., 22, and also expertize of industrial safety of this project of liquidation and registration of the judgment of industrial safety documentation in Rostekhnadzor of the Russian Federation.
  48. Implementation of the state contract on design of external engineering networks of water supply and water disposal to border of "The northwest nanotechnological center" in a northern entrance zone of Gatchina, Leningrad Region.

Projects 2017

Projects 2016

The year 2016 was quite difficult as for design branch in Russia in general, and for our organization in particular. Because of the general reduction of amount of works on design we have concluded only 31 contracts which main share - state.
Because of bad investment climate and economic sanctions the share of contracts with the developer companies was extremely insignificant.
This fact, and also economic events in Russia, became a reason for acceptance by our company "strategy of reduction of expenses" for the purpose of preservation of the leading engineering staff of experts, and deduction of positions in the design market.

Projects 2015

Despite a difficult economic situation in the country, 2015 was quite successful for our company. 48 new contracts were signed, and the share of the state and municipal contracts became much more, than in previous years.
It is explained by the general economic recession in Russia as a result of which many investment projects were stopped while implementation of address programs went under the voted budget.
Road design, development of project and working documentation on construction of water-heating boiler rooms, and also liquidation of hazardous production facilities in the different cities of our country such as: St. Petersburg, Apatity, Ufa, Kazan, Yekaterinburg, Krasnoyarsk, Arkhangelsk etc., became the main direction, in design and exploration work of our company in 2015.

Projects 2014

To summarize 2014, we can say that the direction vector of our activities and assigned work priorities selected by the company in 2012 are completely justified. 61 agreements and state contracts were signed with contractors by the Engineering Infrastructure Design Institute. Among our new partners are such large organizations as OJSC ALROSA-Gaz and FSBI Petersburg Nuclear Physics Institute named after B. P. Konstantinov. Almost the third part of the signed agreements is state contracts. This is a measure of complex execution of works by the specialists of our Institute, our competitive power and confidence placed to us on the part of the state organizations and institutes. And numerous favourable conclusions of the expertise of design and estimate documentation are the evidence of our qualification.

Projects 2013

75 new projects of state and investment financing are the result of the activities of our company for 2013. 2013 shows that the decisions made by us in the previous years and analysis of the Institute development prospects are true. Following this policy, we obtained new possibilities on the market of the design works and showed ourselves to good advantage both among private customers and in the district authorities of the Leningrad and Moscow Regions.

Projects 2012

For the Design Institute, 2012 is the year of discovery and deployment of new trends – out company has been authorized for work package on engineering surveys (topographical, geological engineering, engineering-ecological surveys, etc.) and also our Institute has been awarded the certificates of conformity of the ISO 9001-2008 quality management at development of design documentation and survey works.
A separate group of specialists on road engineering has been formed, by virtue of which the solution on new construction and reconstruction of motor roads in St. Petersburg, Leningrad Region and Naro-Fominsk are implemented.
In 2012 the Engineering Infrastructure Design Institute concluded 90 investment contracts and state contracts and in this connection the works are performed.

Projects 2011

In 2011 our company implemented 60 large projects in different regions of Russia. Our main customers were legal entities and enterprises of JSC INTER RAO UES. New direction on survey, calculation and installation of hanger-support pipeline system was launched in the Design Institute.

Projects 2010

In the year 2010 the Engineering Infrastructure Design Institute has entered into and is performing works under 58 agreements and contracts. In most cases, the projects are owned by investment and developer companies. The Institute has also broadened the geography of its activities, working at facilities in Western Siberia.

Projects 2009

In the year 2009 the Institute specialists completed design works under 34 private commercial and federal contracts. Almost all design project documentation received the necessary approvals in expert and sanctioning organizations and was passed on to be applied for construction and installation works. Company employees built 3 heat power facilities completing full work cycle from design and survey works to commissioning.

Projects 2008

Within the period from June till December 2008 the company implemented 19 package design contracts.
Main assignment – design of linear facilities during modernization of motor roads, design of electrochemical protection installations for underground pipelines.